Germany – Construction work – Neubau Campus Zentralklinikum Magdeburg – NCZMD - ELT-Ausführung Link zur Marktinformationsveranstaltung: https://www.youtube.com/live/c3XqABY7bBQ
Description
The Universitätsklinikum Magdeburg A.ö.R. (UKMD), together with the Medizinische Fakultät (FME) of the Otto-von-Guericke Universität (OvGU), forms the Universitätsmedizin Magdeburg (UMMD). This collaboration unites research, teaching (FME) and patient care (UKMD). With approximately 1,100 beds, the Universitätsmedizin is the largest hospital in the city of Magdeburg and the largest medical facility in northern Saxony-Anhalt. The clinic's physical structure is characterized by decentralization. The main campus, with a total area of approximately 300,000 sqm, is located at Leipziger Straße 44. The Universitätsklinik für Frauenheilkunde, Geburtshilfe und Reproduktionsmedizin and the inpatient department of the Universitätsaugenklinik are located at the external site at Gerhart-Hauptmann-Straße 35 (distance as the crow flies approximately 3 km). The main campus is characterized by a pavilion structure. Clinics, outpatient departments, laboratories, logistics, as well as research and teaching are decentralized across the site. In total, there are 26 clinics and 19 institutes, as well as other independent or associated departments, distributed across both sites. In addition to research and teaching, the Universitätsmedizin Magdeburg offers the full spectrum of a multiprofessional and highly specialized medical maximum care. The entire Universitätsmedizin employs approximately 4,300 employees in research, teaching, patient care, and administration. Additionally, approximately 1,500 students are enrolled in the Medizinische Fakultät, as well as others in the Master's program in Immunology. The current physical structure of the UKMD is characterized by a dislocated building structure, outdated technical infrastructure, long distances, and outdated functional structures. There is an urgent need for action to prepare the UMMD for the future challenges of university medicine and to solve pressing structural problems. The new construction of the Zentralklinikum is intended to bring together the previously dislocated clinics and functional units of the Universitätsklinikum in a centralized and functionally optimized structure, thus resolving an outdated situation. Taking into account the existing areas in buildings 60a and 60b, a large part of the clinical areas and a predominant proportion of the total usable areas of the UKMD will be located in the Zentralklinikum complex in the future. The new construction of the "Neuer Campus Zentralklinikum" is the largest construction project in the state of Saxony-Anhalt and is critical to the future viability of the site at Leipziger Straße. The planning and construction implementation is divided into several individual, interdependent sub-projects. Due to the complexity of the construction measures and the heterogeneous nature of the projects, this is necessary both in terms of content and organization. The current approved budget for the overall measure is approximately 1 billion €, of which approximately 650 million € is allocated solely to the new construction of the Zentralklinikum (construction sections 1 and 2). The focus of the building function should be on the harmony of medically up-to-date and future-proof processes, efficient operational structures, and economical solutions. In addition, the following requirements must be mandatorily considered: • It must be ensured that modern, safe, competitive, and legally compliant healthcare can be provided at the site of the Universitätsmedizin Magdeburg and that current safety risks are minimized. • The planning should be future-proof and innovative. • The highest possible degree of automation should be taken into account. • The planning of the Zentralklinikum must be carried out in such a way that a highly flexible building is created. This flexibility should enable reuse by other medical specialties; possibly as a result of a changed medical strategy. The most complex and medically important project is the new construction of the new central building for healthcare, which, according to the specifications of the existing master plan, directly adjoins the existing buildings Haus 60a and Haus 60b and is intended to form a unit with them. The new central building is a highly complex project in planning, execution, and operation, but also in the preparation of the procedure, with multifaceted dependencies and a large number of users. It is also challenging to integrate the new building into the existing structures, taking into account existing, partially listed, existing buildings. Due to the complex requirements for the new construction of the Zentralklinikum, the client, IPS GmbH, has decided to implement this part of the overall project as an Integrated Project Delivery (IPA). In total, the following IPA partners will be commissioned for planning and execution: Key trade 1: ELT execution – Technical equipment (electrical systems) Key trade 2: HLS execution – Technical equipment (excluding electrical systems) Key trade 3: Technical equipment planning services Key trade 4: Extended planning services Key trade 5: MSR/GLT planning and execution Key trade 6: Medical technology planning and execution (KG 473) Key trade 7: Structural planning services Key trade 8: Execution services for interior construction Key trade 9: Execution services for extended rough construction/special foundation engineering
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Ventilation installation work – Neubau Biophotonik-Gebäude - VE4300 Raumlufttechnik
Leibniz-lnstitut fur Photonische Technologien e. VGermanyVentilation installation workVentilation and air-conditioning installation workDeadline in 32 daysPublished on Sep 02, 2026
Germany – Railway construction works – ABS/NBS KaBa, PfA 9.2, VP I-07.2 Bauleistungen, Oberbau, LSW Bph 9
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)GermanyRailway construction worksDeadline in 32 daysPublished on Sep 02, 2026
Germany – Switching station installation work – Gebäudeautomation
Krankenhauszweckverband BayreuthGermanySwitching station installation workOther electrical installation workAutomation systemDeadline in 33 daysPublished on Sep 02, 2026
Germany – Building demolition and wrecking work and earthmoving work – GB-Rückbau GHI VE-201 Abbruch
SLK-Kliniken Heilbronn GmbH-BauGermanyBuilding demolition and wrecking work and earthmoving workDeadline in 43 daysPublished on Sep 02, 2026