Germany – Ancillary works for pipelines and cables – Rohrleitungsbauarbeiten zum BV "Sanierung Lietzenburger Straße"

BEW Berliner Energie und Wärme GmbHGermanyPublished on Oct 04, 2026
No deadline given

Description

The BEW Berliner Energie und Wärme GmbH intends to award civil engineering and pipeline construction services for the renovation and capacity expansion of a district heating line in Lietzenburger Straße, Berlin. The section of the line to be renovated covers a length of approximately 950 m between Sächsische Straße and Rankestraße, including the associated house connections and distribution lines. In the section between Knesebeckstraße and Fasanenstraße, the works will be carried out jointly with the NBB Netzgesellschaft Berlin-Brandenburg. This requires the renovation and partial relocation of an existing DN 800 gas line to create the necessary clearance for the reinforcement of the district heating line. The subject of this tender are the pipeline construction services of BEW Berliner Energie und Wärme GmbH (Contracting Authority 1 / Section 1 - Lot 1) and of NBB Netzgesellschaft Berlin-Brandenburg (Contracting Authority 2 / Section 2 - Lot 2). The scope of services includes in particular: • New installation of plastic-coated pipe lines (KMR) in various nominal widths up to DN 600, • Adaptation and restoration of house connections, distribution lines and pump house connections, and • Gas pipeline construction work by NBB with dismantling and new installation of a DN 800 steel gas pipeline in a partially changed line position. The construction measure will be divided into seven construction sections and will comprise a total of the dismantling of around 800 m of existing district heating line and the new installation of around 1,000 m of district heating lines of different dimensions. In addition, several shaft structures will be renovated, newly constructed or dismantled and numerous system transitions and network connections will be created. Special requirements exist in the maintenance of the heat supply during the entire construction period by means of operational above-ground line provisos. At the same time, traffic management and accessibility for residents, businesses, pedestrians and cyclists must be ensured. Due to numerous parallel infrastructure projects in the project environment, close coordination with authorities, supply companies and project participants is required. To minimise the impacts, it is planned to carry out several construction sections simultaneously.

CPV codes

Ancillary works for pipelines and cablesDistrict heatingDuctingPipeline, piping, pipes, casing, tubing and related itemsGeneral construction work for pipelines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders