Poland – Construction work – Budowa Specjalnego Ośrodka Szkolno-Wychowawczego w Sanoku – etap II
Description
The subject of the contract is the implementation of the task entitled: Construction of the Special Educational and Care Centre in Sanok – Phase II. Overall scope of the investment: • Phase II investment includes comprehensive internal and external finishing works, installation works of all branches in the scope of internal and external installations, assembly of open joinery, site development according to the project, assembly of photovoltaic installation, construction of a collector draining rainwater to the San, construction of an underground reservoir. • Supply and assembly of equipment for site development, sports fields, recreation areas, parking lots, school environment lighting, external fencing. • Supply and potential assembly of rehabilitation devices, office and classroom equipment, gym equipment, dormitory and canteen equipment. The scope and details of the supplies must be fully agreed with the Contracting Authority. • Assembly of photovoltaic installation on the building roof. • Construction of a container transformer station under the conditions specified by the electricity supplier. Currently, after Phase I of the investment, the object is in the phase of raw open state. The roofs have been covered with compressed channel plates, secured with a single layer of thermal insulation and equipped with temporary overflow drains. The insulation layer and the so-called slope layer have not been laid. The roof of the sports hall at this stage is covered with trapezoidal sheet. The floors in all parts of the building have been closed with a layer of lean concrete. Under the floors, sections of sanitary sewers have been made according to the design documentation, leading them outside the building outline. As part of the works of Phase I of the investment, the collision of a 15kV medium voltage cable, included in the design documentation, has been removed. The conditions for the execution of the water supply connection have changed. After the water supply connection was made by the Lublin Regional Infrastructure Office to the military facilities in the vicinity of the SOSW, the possibility of connecting to the water supply pipe laid on the county plot arose. The contractor is obliged to submit a detailed project of the interior arrangement, which should be submitted to the Contracting Authority for acceptance. 2. The subject of the contract must be realized, in particular, in accordance with the Technical Documentation (Appendix No. 2 to the SWZ). The material scope of the task, which is the subject of the tender, is described in detail in the technical documentation, technical specification of the performance and acceptance of works, and the list of works. Any catalog items have been provided solely to facilitate the preparation of the calculation – their use for valuation is not mandatory. The technical specification, list of works and documentation constitute an appendix to this specification. The quality requirements of the elements constituting the subject of the contract have been described in the technical documentation, in particular in the technical specification of the performance and acceptance of works. Since the remuneration of the contractor indicated in the offer will be of a lump sum nature, the contractor should base the valuation of the offer on the scope indicated in the technical documentation. The list of works has an auxiliary character. The appearance during the execution of the contract of works not included in the list or works in a greater quantity in relation to that accepted in the list will not entitle the contractor to demand additional remuneration – if the necessity of performing these works resulted from the technical documentation. 3. The contractor will provide the Contracting Authority with a warranty and a guarantee for the construction works carried out and the materials used for the period and on the conditions indicated in Section XII of the SWZ (the warranty and guarantee period for defects is one of the criteria for evaluating offers). 4. Special conditions for securing the construction site and carrying out construction works: construction works should be carried out in accordance with the technical conditions and safety rules applicable in construction, as well as agreements to the project, and the construction site should be secured against access by unauthorized persons. The contractor is also obligated and at their cost to: - carry out all types of works by persons possessing current construction authorizations, - secure the construction site and carry out works in accordance with the OH&S regulations and fire safety; - prepare and hand over to the Contracting Authority the post-construction documentation, - secure installations and equipment on the construction site and in its immediate vicinity from their destruction or damage during the execution of works, which are the subject of this Contract; - ensure safe use of the area adjacent to the construction site; - compile during the execution of works, which are the subject of this Contract, all documentation in accordance with the provisions of the Construction Law, - remove all defects and faults found during the execution of works within the period agreed by the Parties, but not longer than the technically justified period necessary for their removal, - protect and manage the construction site until the completion of the implementation of the Investment, which does not exclude the rights of the Contracting Authority to supervise, - eliminate the consequences of the impact of the construction process on the construction environment, - pay fees for waste storage. - carry out the necessary tests and obtain opinions before starting to use.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Heating plant construction work – Generalne wykonawstwo w formule zaprojektuj i wybuduj zadania inwestycyjnego pn.: „Zintegrowana sieć dla innowacyjnej transformacji i dekarbonizacji ciepłownictwa (UNITED HEAT); Etap II Budowa ciepłowni słonecznej”.
Green Future 1 Sp. z o.o.PolandHeating plant construction workSolar collectors for heat productionEngineering design servicesDeadline in 7 daysPublished on Nov 12, 2026
Poland – Building construction work – Przebudowa wraz ze zmianą sposobu użytkowania dwóch obiektów zlokalizowanych na terenie SUW „Filtry” Zakładu Centralnego przy ul. Koszykowej 81 w Warszawie, Dzielnica Ochota, z podziałem na zadania.
Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji w m. st. Warszawie S.A.PolandBuilding construction workOverhaul and refurbishment workBuilding alteration workDeadline in 24 daysPublished on Nov 12, 2026
Poland – Construction work – Budowa siedziby Zarządu Dróg Powiatowych wraz z infrastrukturą towarzyszącą
Powiat Warszawski ZachodniPolandConstruction workEngineering works and construction worksBuilding installation workDeadline in 19 daysPublished on Nov 12, 2026
Poland – Construction work – Budowa bloku S w ramach zadania: „Budowa i wyposażenie infrastruktury szpitalnej w Wojewódzkim Szpitalu Specjalistycznym im. Stefana Kardynała Wyszyńskiego SPZOZ w Lublinie na wypadek sytuacji kryzysowej lub konfliktu zbrojnego”
Wojewódzki Szpital Specjalistyczny im. Stefana Kardynała Wyszyńskiego Samodzielny Publiczny Zakład Opieki ZdrowotnejPolandConstruction workSite preparation and clearance workSurface work for streetsDeadline in 7 daysPublished on Nov 12, 2026