France – Gas supply mains construction work – Renouvellement des marchés de travaux gaz incluant des prestations de type : raccordement, branchement, astreinte, terrassement ponctuel, renouvellement de réseau sur la région Occitanie Pyrénées.
Description
The services expected in the Occitanie Pyrénées area (grouping the departments of Aveyron, Tarn, Tarn-et-Garonne, Haute-Garonne, Lot, Gers, and Ariège) are related to the following lots and according to the following abbreviations: TG = Network extension works TPG = Scheduled earthworks "small holes" BRT = New connection or disconnection of connection AS = Emergency earthworks (also called TPIS internally) SI = Network renewal works PE or steel or major projects (Ex: Displacement of tram line works Zepig: Basic Intervention Area Gas A Zepig contains several municipalities whose list is defined in one of the attachments. Lot 1 => Aveyron - Object: TG-TPG-BRT-AS-SI - Single Award - Maximum Commitment: 12,072,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: ZEPIG FIGEAC, ZEPIG MILLAU and ZEPIG RODEZ Lot 2 => Tarn - Object: TPG-BRT-AS - Single Award - Maximum Commitment: 2,388,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: ZEPIG: ZEPIG CASTRES + ZEPIG ALBI Lot 3 => Tarn-et-Garonne QUERCY - Object: TG-TPG-BRT-AS-SI - Single Award - Maximum Commitment: 6,216,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: ZEPIG CAHORS, ZEPIG MONTAUBAN Lot 4 => Comminges - Object: TG-TPG-BRT-AS-SI - Single Award - Maximum Commitment: 6,720,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: ZEPIG ST GAUDENS Lot 5 => Gers/Muret - Object: TG-TPG-BRT-AS-SI - Single Award - Maximum Commitment: 9,864,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: ZEPIG AUCH, ZEPIG MURET Lot 6 => Ariège - Object: TG-TPG-BRT-AS-SI - Single Award - Maximum Commitment: 6,528,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: ZEPIG PAMIERS Lot 7 => Toulouse + TARN - Object: TG-TPG-BRT-AS-SI - Multi Award - Maximum Commitment: 39,792,000.00 € - Response times: Between 1 and 1.5 hours depending on the municipalities. - Zepig* concerned: For TG-TPG-BRT-AS-SI activities: ZEPIG TOULOUSE For TG-SI activities: ZEPIG: ZEPIG CASTRES + ZEPIG ALBI Lot 8 => Toulouse + OP - Object: TG-SI + Steel MPC - Single Award - Maximum Commitment: 16,800,000.00 € - Zepig* concerned: For TG-SI activities: ZEPIG TOULOUSE For Steel MPC activities: ZEPIG FIGEAC, ZEPIG MILLAU, ZEPIG RODEZ, ZEPIG CASTRES + ZEPIG ALBI, ZEPIG CAHORS, ZEPIG MONTAUBAN, ZEPIG ST GAUDENS, ZEPIG AUCH, ZEPIG MURET, ZEPIG PAMIERS The contracts will include a mutual assistance clause in case of failure of a contractor on an adjacent lot. The contracts will include an environmental clause associated with an RSE selection criterion detailing the means implemented to achieve a minimum of 20% carbon reduction on type sites greater than 200mL on lots 7 and 8. There will also be a social inclusion clause for all lots. The following elements will be analysed during the tendering phase: - Economic and financial capacity with a minimum annual turnover (depending on the lots) on similar activities to the contract object during the previous year if positioning. - Technical and professional capacities (sizing of the company or agency, staff, 3 references of sites or contracts over the last 3 years). In addition, there are the minimum requirements relating to the provision of specific technical skills/qualifications: 1) Possession of AIPR (Authorization to Intervene Near Networks) - AIPR "Operator" in possession of an excavator on site (as of 01/01/2019, all excavators must have this AIPR). - AIPR "Supervisor" in possession of an employee designated per site 2) SS4 training - SS4 technical supervisor and site supervisor training - SS4 site operator training If the candidate does not have all the required qualifications, they must present a subcontracting arrangement in this regard by providing the completed and signed DC4s with the prerequisites of the said subcontractor. A tenderer may not be awarded more than 3 lots. A tenderer may not be awarded lots 7 and 8 simultaneously. If the tenderer is likely to be awarded more than 3 lots, they will be awarded the lots with the highest maximum commitment. If, after being awarded the 3 lots with the highest volume, the other lots for which they were also considered for award will suffer from a lack of success due to their exclusion, then and only then, to avoid this lack of success, they may also be awarded these lots. This is the only exception to the rule of a maximum of 3 lots per tenderer. Indicative planning: Tendering phase: Publication in the OJEU: 20/07/2026 Deadline for requests for participation: 14/09/2026 Selection of candidates following OJEU: 22/09/2026 Tendering phase: Sending of the Tender Documents (contract project, CDC, RC): 28/09/2026 Deadline for receipt of V1 bids: 04/11/2026 at 12pm Selection of the shortlist for the presentation phase: 18/11/2026 Presentations: from 23/11/2026 to 04/12/2026 Deadline for receipt of V2 bids: End of December Legal and financial negotiations: from 12/01/2027 to
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Refurbishment work – ACCORD-CADRE MULTI-ATTRIBUTAIRES A BONS DE COMMANDE : TRAVAUX D'ADAPTATION DES LOGEMENTS AUX PERSONNES AGEES OU EN SITUATION D'HANDICAP - PMR -
ALLIADE HABITATFranceRefurbishment workDeadline in 49 daysPublished on Jul 21, 2026
France – Road-surface painting work – ENTRETIEN DE LA SIGNALISATION HORIZONTALE (2027-2030)
SANEFFranceRoad-surface painting workDeadline in 55 daysPublished on Jul 21, 2026
France – Construction work – RDD et Essais de cables CROSS DR (IDF EST/IDF OUEST/ PARIS)
Enedis SAFranceConstruction workNo deadline givenPublished on Jul 21, 2026
France – Roadworks – RD66 - Créneau de dépassement Vinça Est
CONSEIL DEPARTEMENTAL DES PYRENEES-ORIENTALESFranceRoadworksDeadline in 36 daysPublished on Jul 21, 2026