France – District-heating mains construction work – Travaux portant sur le réseau de chaleur et de froid et de rafraîchissement, et fibre optique, VRD, fourniture et pose des tubes préisoles pour la DSP d'Avignon.
Description
Dalkia was awarded a public service delegation contract for the financing, design, implementation and operation of a heat, cold and cooling network supplied by the recovery of calories from the sewerage network, geothermal wells, a biomass plant, a hybrid plant (HP) and gas boilers. This contract is managed by Dalkia, which is responsible for this DSP and will ultimately supply heating and hot water to subscribers of all types (housing, cultural, education, etc.). The network is made up of 3 sub-assemblies (including fibre laying): - 1 heat network with antennas to the substations which supplies the city of Avignon with hot water, the temperature of the primary fluid at the delivery point is 70°C +/- 2°C; - 1 cold network, the temperature of the primary fluid at the delivery point is 7°C +/- 1°C; - 1 cooling network, the temperature of the primary fluid at the delivery point is 12°C +/- 1°C.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Engineering works and construction works – Conception Réalisation pour le renforcement du passage supérieur en dalle précontrainte 1866, et du passage supérieur en dalle armée 1790 sur l’autoroute A8
ESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPESFranceEngineering works and construction worksBridge renewal construction workConcrete workNo deadline givenPublished on Sep 02, 2026
France – Construction work – Appel d'offres ouvert
Le Logis CorseFranceConstruction workDeadline in 14 daysPublished on Sep 02, 2026
France – Refurbishment work – ROIFFE (86) Ferme de Bellevue - Valorisation hébergement - Lot 1 : Gros oeuvre, second oeuvre, VRD - Lot 2 : Electricité , plomberie, ventilation
SID Nord-OuestFranceRefurbishment workDeadline in 25 daysPublished on Sep 02, 2026
France – Building alteration work – Travaux de réhabilitation énergétique du site DGA Tech de Castelnau-le-Lez
FRANCE TRAVAIL DGA TECHFranceBuilding alteration workWaterproofing workFacade workDeadline in 56 daysPublished on Sep 02, 2026