Germany – Architectural, construction, engineering and inspection services – [ab LPH 5] ELT - Ingenieurleistungen nach Teil 4 Abschnitt 2 HOAI - KG 440 und 450

Vermögen und Bau Baden-Württemberg, Amt PforzheimGermanyPublished on Jul 23, 2026
No deadline given

Description

**Construction Measure:** Schönbornstr. 32, 76646 Bruchsal, Bruchsal, Justizvollzugsanstalt (JVA), Werkhof 1. Phase 1 Services: [from LPH 5] ELT - Engineering services according to Part 4 Section 2 HOAI - Lot 440 + 450, Specialist planning services for building services engineering according to Part 4, Section 2 of the HOAI 2021

**Planning Task:** The phased procurement of engineering services according to Part 4 Section 2 HOAI is intended for the above-mentioned construction measure. The basic services of phases 5 to 8, as well as the special services of phases 3, 5 and 8, are to be provided. The following systems are to be processed: 4. High-voltage systems 5. Telecommunications and information technology systems

**Description of the Planning Task:** Regarding New Construction: The entire electrical building services of the building, including the safety-related systems and installations typical for a correctional facility, are to be planned. The supply connection of the new building is to be temporarily established from the existing system / NSHV. In a later construction phase, a new central power supply consisting of a medium-voltage system, NSHV and standby power system will be constructed. This will supply the JVA in the future. For the implementation of the construction measure, a temporary power supply must be planned and provided. It is expected that the existing power supply (NSHV) and utilisation will be analysed for this purpose. The power requirement of the construction site must be determined and solutions for the temporary power supply must be developed. Coordination with the municipal utilities may also be necessary. You must familiarise yourself with the existing design planning and, on this basis, develop the further design planning. The state directive for the construction of correctional facilities serves as a framework condition. The following documents from the design planning are available: - Installation plan basement - Installation plans ground floor to 3rd floor - Installation plan attic - Diagram power supply/ standby power/ emergency lighting - Diagram telecommunications (IT, video, door monitoring) - Diagram fire alarm system - Diagram ELA - system - Diagram personal emergency signalling system - Diagram intrusion detection system/ door monitoring - Design planning PV system - Cost estimation according to DIN 276 - Explanatory report power supply (USV) and the photovoltaic (PV) system are to be integrated into the building's energy supply concept. Typical building communications systems and safety devices are to be planned. These consist, for example, of structured data cabling, fire alarm system, intrusion detection system/ door monitoring, electroacoustic system, video surveillance system, personal emergency signalling system, sun protection controls, lighting controls and emergency shut-offs. Safety-related systems, such as a fire alarm system, video surveillance and personal emergency signalling system, are already present in the JVA. Therefore, the systems to be erected for the new construction must be integrated into the existing system. In some cases, the manufacturers of the installed systems are predetermined to ensure system integrity. The conduit laying work for other trades involved in the planning (e.g. HLS, building automation) must be integrated into the electrical planning according to the input and coordination and taken into account in the invitation to tender. Regarding Demolition of Old Workshop East: The construction site must first be cleared for the new construction by demolishing the old workshop. As part of an on-site inventory, the electrical installations must be recorded. The recorded quantities must be provided as input for the demolition bill of quantities to the architect.

**Cost Target (Lot 440 + 450):** 3,168,725.00 Euro gross

**Schedule Targets:** Intended construction start: 14.03.2028 (with demolition of the old workshop) Intended completion of construction: 05.09.2031

To carry out the services, the requirements of the Joint Administrative Regulation on the Vetting of Third Parties of 25 July 2017 (GABI, p. 453) must be met. The contractor must commit to complying with the procedures in the Guidelines on the Handling of Classified Information (VS) of the confidentiality level "VS- FOR OFFICIAL USE ONLY".

CPV codes

Architectural, construction, engineering and inspection services