Poland – Construction work for water and sewage pipelines – Budowa wodociągu w ul. Sandomierskiej na odcinku Domaszowice-Cedzyna
Description
The subject of the contract involves the execution of construction works including the construction of a water supply network in ul. Sandomierska on the section from Domaszowice to Cedzyna. The investment covers three municipalities: Kielce, Masłów and Górno. The task will be carried out on the basis of the project “Construction of a water supply in ul. Sandomierska on the section from Domaszowice to Cedzyna”, in the scope of: reconstruction of the water supply wo100 – from the intersection of ul. Sandomierska / Wikaryjska, with inclusion before the chamber on the plot with the cadastral number 2/6, along ul. Sandomierska until the inclusion in PVC – wo110 in ul. Lubrzanka (at the height of the plot of building no. 36, cadastral plot no. 157/1), transfer of the PVC 110mm water supply in ul. Warzywna, transfer of all built-up properties along the route, i.e. Domaszowice 67e, Domaszowice 67d, Domaszowice 67c, Domaszowice 67a, Domaszowice – cadastral plot no. 232/5, Domaszowice 67r and Lubrzanka: 18, 24, 26, 26A, 32, 34, 34b and 36, disconnection of the existing water supply fed from the water intake on the territory of gm. Górno – point of disconnection at the height of plot no. 42. 2. The realization of the subject of the contract includes: a) sections executed by the method of guided boring: cast iron water supply with blocked connections DN 150 mm – length approx. 31.5 m; water supply PE100 RC SDR11 PN16 Ø 180x16.4 mm – length approx. 1584.5 m; water supply PE100 RC SDR11 PN16 Ø 125 mm – length approx. 31.0 m; water supply PE100 RC SDR11 PN16 Ø 63 mm – length approx. 52.6 m; The Contracting Authority notes that on the section from point “6” to point “40” at the height of plot no. 232/8 (length approx. 600 m) the boring will be carried out in rocky soil. b) sections executed by the method of open excavation: water supply PE100 RC SDR11 PN16 Ø 180x16.4 mm – length approx. 225.5 m; water supply PE100 RC SDR11 PN16 Ø 125 mm – length approx. 14.0 m; water supply PE100 RC SDR11 PN16 Ø 63 mm – length approx. 19.3 m; water supply PE100 RC SDR11 PN16 Ø 40 mm – length approx. 174.3 m; cast iron water supply DN 80 mm – length approx. 1.80 m; c) well with a pressure-reducing valve d) installation of underground hydrants (8 units) and above-ground hydrants (8 units) e) transfer of existing networks and water supply connections located along the route of the newly constructed water supply. Note! Connections Lubrzanka 18 (plot 111/1) and Lubrzanka 24 (plot 139) to be carried out with the necessary renovation of the internal installation and connection to this installation, f) liquidation of the water supply excluded from operation g) in accordance with the provisions of the building project agreement TT/20220/0614 TT-U/AMG of 27.03.2020: in connection with the construction of the distribution water supply by the method of guided boring at the intersection of ul. Sandomierska with ul. Wikaryjska, in the vicinity of the existing sanitary sewer network and the storm sewer network, these channels should be subjected to a technical inspection by TV camera before and after the completion of the investment, in agreement with the Sewerage Network and Sewage Pumping Department. The TV inspection report of the above channels should be attached to the acceptance documentation. 3. The Contracting Authority informs that the Contractor is obliged to collect the documents and, on behalf of the Contracting Authority, to notify the competent building supervision authority of the completion of the construction and to obtain a certificate of no objection to the submission (including the payment of administrative fees). The Contracting Authority will grant the selected Contractor, with whom the contract will be concluded, the appropriate Power of Attorney in this respect. 4. The Contracting Authority informs that STWiORB is an essential element of the specification of the conditions of the contract covering the extension and detailing of the design documentation. The Contracting Authority requires that when determining the amounts, the Contractor familiarizes himself with all the elements of the SWZ and analyzes the conditions of the contract, the Technical Specification for the Execution and Acceptance of Construction Works, the design documentation, information, instructions or descriptions of works and materials used. 5. The Contracting Authority informs that the item attached to the SWZ serves only as an auxiliary material and does not constitute the basis for the preparation of the offer by the Contractor. The basis for calculating the estimated price of the offer is the Instructions for Contractors (IDW) and the Description of the Subject of the Contract (OPZ). 6. The subject of the contract also includes restoration works related to the restoration of the site to a condition in accordance with the conditions of the restoration of the surface issued by the road managers, the execution, agreement and approval of the traffic organization projects and the payment of the fee for occupying the road lane in accordance with administrative decisions, the payment of the fee for the possible occupation of real estate for the needs of the construction site or for other purposes of the task during the execution of the works, the carrying out of final tests, the costs of eliminating all defects in the works. The Contractor will also carry out the necessary actions to put the works into operation. The Contractor will bear the costs of the permanent placement of foreign devices in the road lane until the end of the calendar year in which the Final Acceptance Protocol was signed. The Contracting Authority will bear the costs in the following years covered by the Decision allowing the placement of devices in the road lane. The exception are devices necessary for the proper execution of the Works, in which case the Contractor will bear the entire cost. 7
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Budowa dwóch budynków mieszkalnych wielorodzinnych przy ul. Bankowej w Policach
GMINA POLICEPolandConstruction workSite preparation and clearance workConcrete workDeadline in 35 daysPublished on Nov 23, 2026
Poland – Construction work – Przebudowa budynku Urzędu Skarbowego w Tarnobrzegu w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Tarnobrzegu przy ul. Wyspiańskiego 12
Izba Administracji Skarbowej w RzeszowiePolandConstruction workDismantling worksStructures construction workDeadline in 7 daysPublished on Nov 23, 2026
Poland – Road construction works – Budowa drogi dla pieszych i rowerów wzdłuż DK 55 na odcinku Malbork - Sztum
Generalna Dyrekcja Dróg Krajowych i AutostradPolandRoad construction worksSite preparation workBuilding demolition and wrecking work and earthmoving workDeadline in 17 daysPublished on Nov 23, 2026
Poland – Construction work – Rozbudowa i przebudowa budynku i jego adaptacja na cele kulturalne kinoteatr Włókniarz - Rewitalizacja terenów miasta
GMINA MIASTO TOMASZÓW MAZOWIECKIPolandConstruction workDeadline in 48 daysPublished on Nov 23, 2026