Sweden – Prison building construction work – Utförandeentreprenad E3 Byggnad 034, 035, 041, 042
Description
The Prison and Probation Service is in an expansion phase to meet the increased need for new prison places. As part of the expansion, Anstalten Skogome will increase the number of places from approximately 200 to 800. This contract involves the new construction of 2 residential buildings, By 034 and By 035 for inmates, as well as the associated environmental station buildings By 041 and By 042. By 034: Basement below ground level with three residential floors above ground level and a cold attic. Reinforced concrete ground slab, cast-in-place basement walls. Outer and inner walls and ceiling of prefabricated concrete elements. Roof of sheet-covered raw plywood. BTA 4765 m². By 035: Basement below ground level with three residential floors above ground level and a cold attic. Reinforced concrete ground slab, cast-in-place basement walls. Outer and inner walls and ceiling of prefabricated concrete elements. Roof of sheet-covered raw plywood. BTA 4765 m². By 041: Unheated environmental station. Ground-level slab of cast-in-place concrete. Outer walls of prefabricated concrete elements and grass/lawn roof. BTA 18 m². By 042: Unheated environmental station. Ground-level slab of cast-in-place concrete. Outer walls of prefabricated concrete elements and grass/lawn roof. BTA 18 m².
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Sweden – Construction work – Ramavtal Årsentreprenörer Skövde, Byggnadsarbeten
FortifikationsverketSwedenConstruction workDeadline in 27 daysPublished on Oct 19, 2026
Sweden – Construction work – Hyresvärdsupphandling nytt häkte i Helsingborg
KriminalvårdenSwedenConstruction workNo deadline givenPublished on Oct 19, 2026
Sweden – Construction work – Ramavtal för entreprenadarbeten på byggnadsverk
Mölndals stadSwedenConstruction workEngineering works and construction worksConstruction work for engineering works except bridges, tunnels, shafts and subwaysDeadline in 28 daysPublished on Oct 19, 2026
Sweden – Building construction work – Ombyggnation Restadgård hus 1, 19 och 21
MigrationsverketSwedenBuilding construction workDeadline in 53 daysPublished on Oct 19, 2026