Poland – Road construction works – Budowa obwodnicy Klimontowa w ciągu DW 758
Description
The subject of the contract is the project entitled "Construction of the Klimontów Bypass on DW 758", including works consisting of the construction of a section of the provincial road no. 758 with a length of approx. 3.97 km, along with the reconstruction of the existing national road no. 9 for a length of approximately 0.36 km, along with installations and road equipment, necessary infrastructure for the operation of the road, including the construction of engineering structures: a 9-span viaduct over the river "Koprzywianka", access ramps allowing access to the viaduct, and the construction of intersections with municipal, county and national roads. 2. A detailed description and the method of implementing the contract is contained in the Subject of the Contract Description (OPZ), which is Annex no. 7 to the SWZ, and the contract template, which is Annex no. 6 to the SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Road construction works – Rozbudowa drogi wojewódzkiej nr 559 w km 45+060 do km ok 46+730 w m. Maszewo Duże, gm. Stara Biała – nr postępowania 148/26
Mazowiecki Zarząd Dróg Wojewódzkich w WarszawiePolandRoad construction worksSurface work for roadsWorks related to water-distribution pipelinesDeadline in 9 daysPublished on Oct 04, 2026
Poland – Construction work – Budowa nowej siedziby Komendy Powiatowej Policji w Górze w formule zaprojektuj i wybuduj
Komenda Wojewódzka Policji we WrocławiuPolandConstruction workArchitectural services for buildingsDismantling worksDeadline in 9 daysPublished on Oct 04, 2026
Poland – Construction work – Adaptacja części budynku biurowego położonego przy ul. Orzeszkowej 15 i al. Jana Pawła II 40 z przeznaczeniem na lokale mieszkalne
Miejski Zarząd Budynków Mieszkalnych w TychachPolandConstruction workConcrete workSite preparation and clearance workDeadline in 38 daysPublished on Oct 04, 2026
Poland – River regulation and flood control works – Budowa lewego wału rzeki Biała w km rzeki 6+600-8+345 os. Koszyce, m. Tarnów – etap III roboty budowlane
Państwowe Gospodarstwo Wodne Wody PolskiePolandRiver regulation and flood control worksSite preparation workWorks for complete or part construction and civil engineering workDeadline in 4 daysPublished on Oct 04, 2026