Skip to content
Back to search

Germany – General construction work for pipelines – Stadtwerke Barsinghausen: Neubau des Wasserwerks Eckerde - VE 2 Tief- und Rohrleitungsbau (LV05)

Stadtwerke Barsinghausen GmbHGermanyPublished on Nov 16, 2026
27 days left

Description

The Stadtwerke Barsinghausen GmbH has decided to build a new "Wasserwerk Eckerde". The construction site, the foundation, is located directly opposite the existing Eckerde drinking water treatment plant. The new waterworks is planned and equipped according to the latest technology. The scope of services of this tender relates to the civil engineering and pipeline construction works (VE2). The laying is to be carried out in accordance with DIN EN 805. Width, evenness and gradient are to be checked. For the laying of sewer pipes, the gradient specified in the execution plans must be strictly adhered to. The trench may only be backfilled once the survey carried out by the contractor has been completed. Any resulting difficulties, waiting times, etc. are to be included in the unit prices. The surveys are to be carried out by a qualified surveying office or by the contractor's own specialist personnel and coordinated with the local construction supervision. After completion of the laying, a certificate from a specialist company must be submitted to confirm the proper laying of all pipelines.

CPV codes

General construction work for pipelinesConstruction work for tunnels, shafts and subwaysConstruction work for water and sewage pipelinesWorks related to water-distribution pipelines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders