Skip to content
Back to search

Germany – Insulated joints – Isolierkupplungen_SPO

terranets bw GmbHGermanyPublished on Apr 16, 2026
No deadline given

Description

The terranets bw is planning the "Spessart-Odenwald-Leitung (SPO)". The planned natural gas transport pipeline, with a total length of approximately 117 kilometers (DN 1,000, DP 90 bar), runs through the Federal State of Hesse and the Free State of Bavaria. The route largely follows the course of the existing Mitte-Deutschland-Anbindungs-Leitung (MIDAL). In the Federal State of Hesse and the Free State of Bavaria, the SPO runs from north to south through the districts of Main-Kinzig, Aschaffenburg, Offenbach, Darmstadt-Dieburg and Bergstraße. Nominal diameter main pipeline: 1,016 mm Minimum wall thickness main pipeline: 16 mm Design pressure: DP 90 Route length: approximately 117 km The overall SPO project has been divided into four planning approval sections: Section Hesse-North (PLA) from SP 0+000 to approximately SP 35+090, or from the locality of Wirtheim (municipality of Biebergemünd) - locality of Klein-Auheim (city of Hanau), length approximately 35.1 km Section Hesse-Middle (PLB) from approximately SP 35+090 to approximately SP 83+220, or from the locality of Klein-Auheim (city of Hanau) - locality of Herchenrode (municipality of Modautal), length approximately 48.1 km Section Hesse-South (PLC) from SP 83+220 to approximately SP 116+700, or from the locality of Herchenrode (municipality of Modautal) - locality of Lampertheim (city of Lampertheim), length approximately 33.5 km Section Bavaria (PLD) In the Free State of Bavaria, various route sections within Section Hesse-North (PLA), length approximately 1.5 km

CPV codes

Insulated jointsPipe fittings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders