The present contract concerns the implementation of drainage works for buried networks and the restoration of 5 courtyards (Bonaparte, Honneur, Loges, Mât américain / cheminement Lenoir, Perret) of the Beaux-arts_Malaquais site, at 14, rue Bonaparte, 6th arrondissement, Paris. The works subject to the contract include, in particular:
1. Technical phase on the 5 courtyards:
- removal of soils;
- compaction and consolidation of soils;
- drainage of buried networks.
2. Heritage phase on the 5 courtyards:
- replacement of new and restored soils;
- restoration of grilles and installation of new ones;
- lighting.
The services subject to the present contract are divided into 4 lots as follows:
• Lot 1: VRD / Plumbing / Site Installation
• Lot 2: CFO / CFA / Lighting
• Lot 3: Masonry / Cut Stone / Roofing
• Lot 4: Locksmithing / Carpentry
The present contract includes, for each of the lots, a firm section (TF) and 2 optional sections (TO) as defined below:
- TF: technical phase works: Bonaparte + Loges + Honneur.
- TO1: 1) technical phase works: Perret + Mât américain / cheminement PMR Lenoir 2) heritage works: Perret.
- TO2: heritage works: Bonaparte + Honneur + Loges + Mât américain / cheminement PMR Lenoir.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Overhaul and refurbishment work – ACCORD CADRE A BONS DE COMMANDE – TRAVAUX DE MONTEE EN GAMME DANS LES LOGEMENTS A USAGE LOCATIF DU PATRIMOINE IN’LI AURA
in'li AURAFranceOverhaul and refurbishment workDeadline in 33 daysPublished on Sep 03, 2026
France – Sewerage work – Travaux de réhabilitation des caniveaux à fentes des autoroutes A8, A50, et A57 du réseau ESCOTA.
ESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPESFranceSewerage workDeadline in 33 daysPublished on Sep 03, 2026
France – Construction work – Construction d'un bâtiment de 185 lits
EPD de GrugnyFranceConstruction workExcavating and earthmoving workStructural shell workDeadline in 45 daysPublished on Sep 03, 2026
France – Museum construction work – Construction du musée de Saint-Gilles
La SATFranceMuseum construction workDressed stoneworkStoneworkDeadline in 24 daysPublished on Sep 03, 2026