Poland – Audio-visual equipment – Aranżacja i wykonanie tras turystycznych w podziemiach Sztolni Królowa Luiza.
Description
**Contract title:** „Arrangement and execution of tourist routes in the undergrounds of Sztolnia Królowa Luiza”
**Basic information:** The contract concerns the arrangement and execution of tourist routes in the undergrounds of Sztolnia Królowa Luiza. Within one complex of underground excavations, it is planned to put into use two tourist routes. The route dedicated to the elements will be fully modernized and upgraded, while the historical route will be a new product. As part of the contract, the Contractor is obliged to execute two complete tourist routes, which include arrangement elements (scenography, buildings, etc.), AV equipment, lighting, multimedia content, as well as multimedia and ethernet installations. The descriptions of the subject of the contract are contained in 3 design documents:
1. Concept and design of a new underground exhibition dedicated to the elements, created on the basis of tourist routes in Sztolnia Królowa Luiza along with annexes. Note: Annex No. 2 to the concept and design contains an update of the minimum technical parameters specifications – replaces the content of pages 33-46 of the project.
2. Concept and design of a new underground historical exhibition created on the basis of tourist routes in Sztolnia Królowa Luiza. Note: Annex No. 2 to the concept and design contains an update of the minimum technical parameters specifications – replaces the content of pages 41-46 of the project, in the scope of the minimum technical parameters specifications.
3. Execution of the installation project as part of the newly designed tourist routes located in Sztolnia Królowa Luiza in the Muzeum Górnictwa Węglowego in Zabrze
The scope of this task does not include:
AD.1.1 The following is excluded from the procedure: Station 15 Obwał
AD.1.2 The following is excluded from the procedure: The realization of content for Stations 17 and 18. The complete musical work will be handed over for the realization of the stations after signing the contract with the Contractor.
AD.2.1 The following is excluded from Station 5: Conveyor Ride – Audio Tour transport device
AD.2.2 The following is excluded from the procedure: Station 23 In the queue Karlik (content)
Both Station 15 Obwał and the delivery along with the installation of the transport device will be covered by separate procedures.
**Location** The subject of the contract will be realized in the underground excavations of Sztolnia Królowa Luiza, i.e., historical objects of the Main Key Heritage Adit and the Królowa Luiza Mine in Zabrze. Entrances to the excavations from ul. Wolności 410, Mochnackiego 12, K. Miarki 8 (access from the waterway side). The excavations are located at a depth of 0 to -40 meters. The atmospheric conditions in the excavations may vary slightly:
1. Excavations of the Królowa Luiza Mine at ul. Mochnackiego 12
a. High dustiness
b. Temperature fluctuating within 11°C -16°C
c. Air humidity within 77%
2. Excavations of the Main Key Heritage Adit
a. Temperature fluctuating within 10°C -18°C
b. Air humidity within 84%
Documents attached to the detailed description of the subject of the contract:
1. Concept and design of a new underground exhibition dedicated to the elements, created on the basis of tourist routes in Sztolnia Królowa Luiza along with annexes – Annex No. 1 to OPZ
2. Concept and design of a new underground historical exhibition, created on the basis of tourist routes in Sztolnia Królowa Luiza along with annexes – Annex No. 2 to OPZ
3. Execution of the installation project as part of the newly designed tourist routes located in Sztolnia Królowa Luiza in the Muzeum Górnictwa Węglowego in Zabrze – Annex No. 3 to OPZ
4. Execution of installations as part of the newly designed tourist routes located in Sztolnia Królowa Luiza in the Muzeum Górnictwa Węglowego in Zabrze (electrical industry) – project realized by a separate procedure - Annex No. 4 to OPZ
5. Existing telecommunication network - The existing ethernet installation in the Main Key Heritage Adit is built on single-mode fiber optic cables and computer twisted pair S/FTP. The main skeleton of the cable network is based on fiber optic cables. Connections between the server room and individual server cabinets (SI) are realized with a 24J fiber optic cable, while connections between multimedia devices with a S/FTP OUT DOOR type cable. The current state is illustrated by the appropriately attached diagrams: 5.1. Diagram 2-05 - SI cabinets cameras sensors, wi-fi part 1 5.2. Diagram 2-05 - SI cabinets cameras sensors, wi-fi part 2 5.3. Diagram 2-05 - SI cabinets cameras sensors, wi-fi part 3 5.4. Diagram 2-05 - SI cabinets cameras sensors, wi-fi part 4
When implementing the contract, it is necessary to take into account the requirements of accessibility for people with disabilities in accordance with the document Standards of accessibility for the cohesion policy 2021-2027.
In the scope of construction works, the Contractor is obliged to fulfill the obligations:
1) obligation to equip mobile machines not moving on roads (i.e. construction machines – excavators, loaders, bulldozers, etc.) with a power output of over 18 kW with a solid particle filter,
2) obligation to clean the streets and the area around the construction site, which are contaminated as a result of the construction, by wet cleaning (by the contractor of the ordered contract),
3) watering the storage sites of loose materials in the non-rainy period,
4) use of stations for removing soil or mud from the wheels of heavy equipment leaving the construction site,
5) use of covering when transporting dusty materials. (Resolution No. VI62/8/2023 of the Silesian Voivodeship Council of 20 November 2023 on the adoption of the update of the "air protection program for the Silesian Voivodeship" adopted by Resolution No. vi/21/12/2020 of the Silesian Voivodeship Council of 22 June 2020 Dz.U. 2023, poz. 8625)
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Data-transmission equipment – Przedmiotem zamówienia jest zaprojektowanie i wykonanie multioperatorskiej instalacji wzmacniającej sygnał telefonii komórkowej z dostawą, rozmieszczeniem i zainstalowaniem montażem niezbędnych urządzeń transmisyjno-odbiorczych (anten) oraz stacji obsługi (BTS) i uruchomieniem systemu, której zadaniem jest pokrycie sygnałem LTE/GSM w budynkach na terenie Filii nr1 Szpitala Wojewódzkiego w Poznaniu
Szpital Wojewódzki w PoznaniuPolandData-transmission equipmentTelephone and data transmission servicesSatellite communications equipmentDeadline in 39 daysPublished on Nov 25, 2026
Poland – Audio-visual equipment – Dostawa i wykonanie Studia nagrań, Studia montażowego oraz Centrum Streamingowego w Uniwersytecie Pomorskim w Słupsku
Uniwersytet Pomorski w SłupskuPolandAudio-visual equipmentMultimedia equipmentVideo camcordersDeadline in 14 daysPublished on Nov 25, 2026
Poland – Network infrastructure – Dostawa klastra urządzeń bezpieczeństwa sieciowego Next-Generation Firewall (NGFW) wraz z oprogramowaniem, wsparciem technicznym oraz usługą wdrożenia i relokacji urządzeń.
Wojskowy Instytut Medyczny – Państwowy Instytut BadawczyPolandNetwork infrastructureSecurity software packageTelecommunications cableDeadline in 7 daysPublished on Nov 25, 2026
Poland – Communications equipment – Standaryzacja stanowisk do elektronicznej rejestracji danych identyfikacyjnych osób
KOMENDA GŁÓWNA POLICJIPolandCommunications equipmentInformation systems and serversDisplay screensDeadline in 22 daysPublished on Nov 25, 2026