Switzerland – Electrical machinery, apparatus, equipment and consumables; lighting – LOS 2 Generator Hilfssysteme Kraftwerk Pradella
Description
The Engadiner Kraftwerke AG (EKW) operates the Ova Spin – Pradella power plant stage. As part of the life extension of various mechanical systems, the generator rotor lifting device, the generator brake and the associated piping systems are being renewed or overhauled. The scope of work includes in particular: * Dismantling and proper disposal of the existing lifting devices, compressed air systems, pipelines, fittings and ancillary systems; * Overhaul of the existing lifting and braking cylinders; * Supply, installation and commissioning of new pipelines, fittings, compressed air system and sensors; * Replacement of the existing manual lifting pump; * Carrying out the necessary functional and tightness tests; * Preparation and handover of the overhaul, test and plant documentation. The works will be carried out at the Pradella power plant and must be carried out taking into account the operational requirements of the contracting authority. The aim of the measure is to ensure safe, reliable and long-term operation of the generator lifting and braking system.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Switchgear – 110 kV GIS-Schaltanlage dreiphasig gekapselt
EKT AGSwitzerlandSwitchgearDeadline in 100 daysPublished on Nov 16, 2026
Switzerland – Insulated wire and cable – Anlagenverkabelung (NS) Bundle 2026-2
Swissgrid AG - Asset & MaintenanceSwitzerlandInsulated wire and cableFibre-optic materialsElectrical installation workDeadline in 92 daysPublished on Nov 15, 2026
Switzerland – Electrical machinery, apparatus, equipment and consumables; lighting – EPFL DOUBLE DECK - CFC 236.1 Groupe secours
EPFL - Domaine des AchatsSwitzerlandElectrical machinery, apparatus, equipment and consumables; lightingDeadline in 33 daysPublished on Nov 10, 2026
Switzerland – Electricity distribution and control apparatus – GIS Container Verbois
Swissgrid AG - Asset & MaintenanceSwitzerlandElectricity distribution and control apparatusSwitchgearParts of electricity distribution or control apparatusDeadline in 92 daysPublished on Nov 04, 2026