Skip to content
Back to search
This tender has expired.

Germany – Geothermal power station construction work – Geothermie Prenzlau - Hochbau Geothermieheizzentrale und Anlagentechnik inkl. Wärmepumpen

Stadtwerke Prenzlau GmbHGermanyPublished on Apr 06, 2026
No deadline given

Description

The Stadtwerke Prenzlau plan to reactivate the use of geothermal energy for district heating. In 2025, an injection well was upgraded and a production well was drilled for the implementation of the project. The plant will be constructed at two locations. The location at the production well with wellhead cover and the heating centre with heat exchangers and heat pumps is at Thomas-Müntzer-Platz 4, 17291 Prenzlau. The second location at the injection well with wellhead cover and filter building is at Straße Am Krankenhaus, 17291 Prenzlau. Both locations are accessible via paved roads. The scope of work includes the process engineering and electrical design of the geothermal plant and thermal water pipeline. The main locations of the system are the drill cellar and heating centre at the drill site Gt Prenzlau 4 (Thomas-Müntzer-Platz 4) and the filter house and drill cellar at Gt Prenzlau 3/89 (Am Krankenhaus), connected via a thermal water pipeline. The project's goal is to provide heat via a heat pump system using the geothermal energy of the subsurface.

CPV codes

Geothermal power station construction workHeat pumpsConstruction works for power plants and heating plantsConstruction workBuilding construction workHeating plant construction workDistrict-heating plant construction workConstruction work for power plant

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders