Greece – Transformer substation – Έργα Ενίσχυσης στους Υ/Σ ΥΤ/ΜΤ Καλλιστηρίου, Αγιάς και Λαμίας
Description
The subject of the contract is the implementation of the following project: «Works for the reinforcement of the substations of Kallisteion, Agia and Lamia». (CPV: 45232221, DA17-2, 45315400, 45315500, 31174000, 31682300). The project includes the following reinforcement works, hereinafter referred to as sub-projects:
Sub-project A: Reinforcement of the Kallisteion Substation with a 3rd 150/20kV Power Transformer, and more specifically:
- Addition of a 150kV Power Transformer Gate,
- Connection of 150/20kV Power Transformer (No3), 40/50MVA with the HT and MT,
- Expansion of the MT side, with the addition of eight (8) new MT departure panels of type OLM, one (1) MT arrival panel of type TM, one (1) set of MT busbar connection panels of type BRM/BSM and one (1) busbar formation panel of type AD, if required,
- Expansion of the IEC61850 network of the DEDDIE and integration of the new PMUs in the PMU DEDDIE.
Sub-project B: Reinforcement of the Agia Substation with a 2nd 150/20kV Power Transformer, and more specifically:
- Addition of a 150kV Power Transformer Gate,
- Supply and installation, addition of 150/20kV Power Transformer (No2), 40/50MVA,
- Expansion of the MT side, with the addition of eight (8) new MT departure panels of type OLM, one (1) MT arrival panel of type TM, one (1) set of MT busbar connection panels of type BRM/BSM, one (1) MT shunt reactor panel of type CM and one (1) busbar formation panel of type AD, if required,
- Addition of a shunt reactor assembly,
- Upgrade of the existing control and protection equipment under the responsibility of DEDDIE and ADMHE,
- Implementation of a new communication network according to IEC-61850 and installation of a new PMU under the responsibility of DEDDIE,
- Implementation of a new communication network according to IEC-61850 and installation of a new PMU under the responsibility of ADMHE.
Sub-project C: Reinforcement of the Lamia Substation with a 3rd 150/20kV Power Transformer, and more specifically:
- Addition of a 150kV Power Transformer Gate,
- Renovation and expansion of the HT busbar protection system,
- Supply and installation, addition of 150/20kV Power Transformer (No3), 40/50MVA,
- Expansion of the outdoor MT side, with the addition of eight (8) new MT departure panels of type OLM, one (1) MT arrival panel of type TM, one (1) MT busbar connection panel of type BSM and one (1) shunt reactor panel of type CM,
- Addition of a shunt reactor assembly,
- Implementation of a new communication network according to IEC-61850 and installation of a PMU under the responsibility of DEDDIE. Integration of the PMUs of the new HT gate and the new MT panels under the responsibility of DEDDIE.
1. The project will be carried out in the aforementioned substations of the Interconnected System, which are in operation. Therefore, enhanced protection measures must be taken during the execution of the works, and the necessary isolations of the in-service equipment must be scheduled properly and in a timely manner. The execution and completion of the individual sub-projects will be carried out in a specific sequence as indicated in the contract documents. The subject of the project includes the preparation of the required studies, the construction of the necessary civil works, the supply of all necessary materials/equipment, their erection/installation in the respective substations and their energisation/commissioning after the necessary checks and tests. Furthermore, as part of the project, the corresponding works for the extension of the System under the responsibility of ADMHE will be carried out, in accordance with the specifications in the technical and commercial sections of the Declaration.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Greece – Pumping station construction work – Modifications, construction of a new pumping station & accompanying infrastructure for the interconnection of Kozani district heating with the unified district heating network of Western Macedonia
ΔΗΜΟΤΙΚΗ ΕΠΙΧΕΙΡΗΣΗ ΥΔΡΕΥΣΗΣ ΑΠΟΧΕΤΕΥΣΗΣ ΚΟΖΑΝΗΣGreecePumping station construction workDeadline in 14 daysPublished on Oct 26, 2026
Greece – Harbour construction works – ΕΡΓΑ ΒΕΛΤΙΩΣΗΣ ΛΕΙΤΟΥΡΓΙΚΟΤΗΤΑΣ, ΠΡΟΣΤΑΣΙΑΣ ΚΑΙ ΑΣΦΑΛΕΙΑΣ ΝΑΥΣΙΠΛΟIΑΣ ΛΙΜΕΝΟΣ ΑΓ. ΝΙΚΟΛΑΟΥ ΒΟΛΙΜΩΝ ΖΑΚΥΝΘΟΥ
ΠΕΡΙΦΕΡΕΙΑ ΙΟΝΙΩΝ ΝΗΣΩΝ / ΠΕΡΙΦΕΡΕΙΑΚΗ ΕΝΟΤΗΤΑ ΖΑΚΥΝΘΟΥGreeceHarbour construction worksDeadline in 31 daysPublished on Oct 19, 2026
Greece – Historical monument or memorial construction work – «Αποκατάσταση Θεάτρου ''ΑΠΟΛΛΩΝ'' Πατρών για τη λειτουργική επανάχρησή του με την ενίσχυση του φέροντος οργανισμού του Μεγάρου Λόγου και Τέχνης» (Φάση Β΄) στο πλαίσιο των ΥΕ2 και ΥΕ7 της Πράξης «Αποκατάσταση Θεάτρου "ΑΠΟΛΛΩΝ" Πατρών με τη λειτουργική επανάχρησή του»
Ελληνικό Δημόσιο / Υπουργείο Πολιτισμού / Γενική Διεύθυνση Αναστήλωσης, Μουσείων και Τεχνικών Έργων / Διεύθυνση Προστασίας και Αναστήλωσης Νεώτερων και Σύγχρονων Μνημείων (ΔΠΑΝΣΜ)GreeceHistorical monument or memorial construction workRefurbishment workElectrical installation workDeadline in 23 daysPublished on Oct 18, 2026
Greece – Construction work – Διακήρυξη έργου με τίτλο: "Εργασίες Άρσης Καταπτώσεων Πρανών Ρεμάτων (ΕΤΗ 2026-2028)"
ΔΙΕΥΘΥΝΣΗ ΕΡΓΩΝ ΑΝΤΙΠΛΗΜΜΥΡΙΚΗΣ ΠΡΟΣΤΑΣΙΑΣ ΠΕΡΙΦΕΡΕΙΑΣ ΑΤΤΙΚΗΣGreeceConstruction workDeadline in 44 daysPublished on Oct 14, 2026