Poland – Supervision of project and documentation – Nadzór i kontrola w pełnym zakresie nad realizacją prac związanych z modernizacją ewidencji gruntów i budynków, tj: „Utworzeniem oraz modernizacją cyfrowych baz danych: EGIB, BDOT500, GESUT dla potrzeb realizacji projektu „e-Geodezja II – uzupełnienie cyfrowego zasobu geodezyjnego województwa lubelskiego” – Etap I, część 70 – gmina Parczew
Description
The subject of the contract includes the control and monitoring of the implementation of works related to the inventory unit: 061304_5 Parczew Gmina, Parczewski County, concerning:
- the modernisation of land and building records by creating digital databases EGiB or improving the quality and currency of EGiB databases, along with bringing these databases into line with the conceptual data model of EGiB, as defined in Annex No. 6 to the Regulation of the Minister of Development, Work and Technology of 27 July 2021 on land and building records,
- the creation of an initial geodetic database of the land survey network GESUT in line with the conceptual data model of GESUT, as defined in the Regulation of the Minister of Development, Work and Technology of 23 July 2021 on the geodetic survey of the land survey network,
- the creation of a database of topographic objects with a level of detail ensuring the creation of standard cartographic works in scales 1:500-1:5000 (BDOT500) in line with the conceptual data model, as defined in the Regulation of the Minister of Development, Work and Technology of 23 July 2021 on the database of topographic objects and the basic map. The subject of the contract is described in detail in Annex No. 1 to the SWZ. The contractor will be obliged to carry out technical control, including the quantitative and qualitative verification of materials, technical documentation and data sets transferred to the Contracting Authority as part of the works related to the modernisation, creation or conversion of EGiB, BDOT500 and GESUT databases, including both materials already in the possession of the Contracting Authority, which have not yet been subjected to technical control, and materials transferred to the Contracting Authority during the implementation of this contract. The control will be carried out in accordance with the scope, rules and requirements specified in Annex No. 1 to the SWZ – Description of the Subject of the Contract (OPZ), taking into account the applicable legal provisions and technical standards in the field of geodesy and cartography.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Engineering-design services for traffic installations – Opracowanie projektu wykonawczego na budowę sygnalizacji świetlnej wraz z pełnieniem nadzoru autorskiego
Zarząd Dróg Miejskich w WarszawiePolandEngineering-design services for traffic installationsSupervision of building workDeadline in 32 daysPublished on Nov 19, 2026
Poland – Engineering design services – 07800 - Opracowanie dokumentacji projektowej dla zadania pn.: Rozbudowa ul. Grota – Roweckiego z budową buspasa we Wrocławiu
Gmina WrocławPolandEngineering design servicesEngineering design services for the construction of civil engineering worksSupervision of project and documentationDeadline in 14 daysPublished on Nov 19, 2026
Poland – Supervision of building work – Pełnienie kompleksowego nadzoru inwestorskiego w m. Nowy Glinnik z. 11888
Rejonowy Zarząd Infrastruktury w BydgoszczyPolandSupervision of building workNo deadline givenPublished on Nov 19, 2026
Poland – Architectural, construction, engineering and inspection services – Opracowanie dokumentacji projektowej dla zadania pn.: „Budowa drogi dla pieszych i rowerów w ciągu DK 83 na odc. Charłupia Mała - Sieradz wraz z rozbiórką i budową nowego obiektu mostowego na rz. Myja”.
Generalna Dyrekcja Dróg Krajowych i AutostradPolandArchitectural, construction, engineering and inspection servicesProject and design preparation, estimation of costsArchitectural, engineering and surveying servicesDeadline in 39 daysPublished on Nov 19, 2026