Czechia – Road construction works – I/50 Bučovice, obchvat
Description
The subject of the contract is the construction of the I/50 road in a new alignment around the city of Bučovice. The construction starts approximately 50 m west of the intersection with road III/0506 to Maref at the passported kilometre 17,690. The connection of the construction to the original alignment of the I/50 road is at the end of the local part of Vícemilice at the passported kilometre 23,530. The total length of the construction is 5570 m. The new alignment of the road will be constructed as a directionally separated two-lane carriageway in the initial and final sections in the design category S 11,5/90, while the remaining central part will correspond to the category S 13,5/90 (2+1 layout) with a length of 1990 m without merging lanes. The new alignment crosses a railway line twice and includes 3 grade-separated intersections, 6 bridges on the I/50 road, 1 bridge over the I/50 road, 2 bridges outside the I/50 road, 3 retaining walls, which are solved as separate structures. The construction also includes the construction of 2 at-grade intersections, 6 relocations of lower category roads, 2 accesses to retention ponds, ramps and temporary bypass roads. Furthermore, an integral part of the construction are water management structures, relocations of affected engineering networks, the creation of embankments, noise barriers.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Erection of road-barriers – Odstraňování následků dopravních nehod na bezpečnostním zařízení a vybavení doplňková oblast Čechy (SSÚD 8, 11, 12, 13, 14, 33)
Ředitelství silnic a dálnic s. p.CzechiaErection of road-barriersDeadline in 10 daysPublished on Nov 18, 2026
Czechia – Intercity railway works – Optimalizace a elektrizace trati České Velenice (mimo) – Veselí nad Lužnicí (mimo) – Infrastruktura
Správa železnic, státní organizaceCzechiaIntercity railway worksRailway bridge construction workConstruction work for tunnels, shafts and subwaysDeadline in 10 daysPublished on Nov 18, 2026
Czechia – Road construction works – I/45 Krnov - západní obchvat
Ředitelství silnic a dálnic s. p.CzechiaRoad construction worksDeadline in 21 daysPublished on Nov 18, 2026
Czechia – Carriageway resurfacing works – D55: Hulín-Skalka LJP (vybrané úseky)
Ředitelství silnic a dálnic s. p.CzechiaCarriageway resurfacing worksDeadline in 32 daysPublished on Nov 18, 2026