Germany – Demolition work – Abbruch Ruckbau Schadstoffe Los1
Description
Brief description of the main positions ABR_VE_01 Demolition and hazardous substances House 1 (MR 14-18) Demolition of the attic and hazardous substance remediation in the occupied residential building. General construction site facilities will be provided by the client. Demolition works approx.: 20 m³ movable items, 183 m² elastic floor coverings, 538 m² ceramic floor coverings, 528 m² screed, 80 doors with frames, 42 m³ non-load-bearing masonry walls, 221 m² lightweight walls 166 m² wall coverings. Black areas with airlock and negative pressure technology. Dismantling and disposal approx.: 1,288 m² insulating materials, 560 m² bitumen-containing sealants, 540 m² PAH-contaminated mastic asphalt, 1,995 m² contaminated plasters, 1,610 m² external thermal insulation composite systems, 400 m pipe insulation. Release measurements, decontamination and fine cleaning on 1,660 m² remediation areas with proof of compliance and disposal. Quantity of hazardous waste approx. 180 t, dismantling materials approx. 100 t. The work will be carried out in 3 construction phases.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Lift installation work – T-04 Errichtung von Aufzugsanlagen am Neubau des LKA Sachsen-Anhalt in Barleben
Leinemann & Partner Rechtsanwälte mbBGermanyLift installation workLiftsDeadline in 27 daysPublished on Sep 21, 2026
Germany – Electrical wiring and fitting work – HD, Uni, med. Fakultät Mannheim, Ersatzneubau, Hörsaalgebäude, Gebäude 6 Elektro- Sicherheits- und Informationstechnische Anlagen
Vermögen und Bau Baden-Württemberg, Amt Mannheim und Heidelberg Dienstsitz MannheimGermanyElectrical wiring and fitting workDeadline in 27 daysPublished on Sep 21, 2026
Germany – Track construction works – GMT 2027 Paket 5 - 4 Lose Region N, N, N, SW
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)GermanyTrack construction worksDeadline in 15 daysPublished on Sep 21, 2026
Germany – Ventilation and air-conditioning installation work – Erweiterung Städt. Wirtschaftsschule zur Integration der Staatl. FOS - Raumlufttechnische Anlagen
Stadt SchwabachGermanyVentilation and air-conditioning installation workDeadline in 13 daysPublished on Sep 21, 2026