Skip to content
Back to search

France – Track construction works – Métro ligne 8 - Reconfiguration de l’interstation Créteil Université – Créteil Préfecture / Lot Voie

RATPFrancePublished on Mar 23, 2026
No deadline given

Description

In connection with the arrival of the new MF19 rolling stock on Line 8 of the Metro, a reconfiguration of the track equipment at Créteil Préfecture is envisaged. This reconfiguration involves transforming the current Track 1 and the storage track known as Track Z. The current Track D, which is a storage track, will be transformed into the main track and renamed Track 1. This new configuration will allow the operator to store trains on the future Track Z without cutting the main tracks and to improve storage conditions in the target situation. The present framework agreement aims to define the conditions and modalities for: For the Track: track works, the main works of which will be carried out under Temporary Interruption of Traffic (hereinafter ITC) scheduled for the summers of 2027 and 2028 between Maisons-Alfort les Julliottes and Créteil Pointe du Lac stations. For Civil Engineering: the construction of a walkway, the construction of a platform PF2, the construction of a new drain related to the creation of a new track on the Créteil Université / Créteil Préfecture interstation.

CPV codes

Track construction worksConcrete carcassing work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders