Austria – Electrical fitting work – (ProVia-ID 141414) ETZ-Akku; St. Pölten; Elektroarbeiten - Schwenkbare Deckenstromschiene (TSI0.1225)
Description
On the premises of ÖBB Technische Services GmbH, a maintenance hall with an area of approximately 4800 m² is being constructed. The electrical work for this hall is to be carried out. This includes the creation of the low-voltage supply, the earthing system, the lightning protection, the electrical installations, the lighting, the emergency and safety lighting, the fire alarm system, and the EDV and LAN network cabling. Furthermore, the hall is to be equipped with a swiveling ceiling power rail (voltage levels 15 kV 16.7 Hz, 25 kV 50 Hz and 3 kV DC). The hall has 3 tracks, each 80 m long.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Austria – Construction work for university buildings – 25-011.843 Campus Quantum Cube-05b Labordecken
Universität WienAustriaConstruction work for university buildingsDeadline in 27 daysPublished on Sep 10, 2026
Austria – Works for complete or part construction and civil engineering work – Rahmenvertrag für Baumeisterarbeiten Tiefbau in den Objekten der Stadt Wien - Wiener Wohnen
Stadt Wien - Wiener WohnenAustriaWorks for complete or part construction and civil engineering workTrench-digging workSewer construction workDeadline in 39 daysPublished on Sep 10, 2026
Austria – Construction work for bridges and tunnels, shafts and subways – (ProVia-ID 152890) Loifarn - Dorfgastein; Oberer und Unterer Klammtunnel Modernisierung, km 7,416-8,949, Bau; Ertüchtigung Oberer- und Unterer Klammtunnel
ÖBB-Infrastruktur AGAustriaConstruction work for bridges and tunnels, shafts and subwaysDeadline in 28 daysPublished on Sep 10, 2026
Austria – Motorway construction works – A02 Süd Autobahn, INSB Hermagor - Staatsgrenze Bauphase I, Km 378,000 - Km 380,856 - Instandsetzung Fahrbahnen, Brücken Entwässerung und Gewässerschutzanlagen
Autobahnen- und Schnellstraßen- Finanzierungs-AktiengesellschaftAustriaMotorway construction worksDeadline in 24 daysPublished on Sep 10, 2026