The subject of the contract is: RDW in Hrubieszów. Services for cutting road verges Task no. 1 – Cutting road verges from Hrubieszów – national road no. 846 and no. 816 Task no. 2 – Cutting road verges from Tyszowce – national road no. 844 and no. 867
2. The scope of the services includes:
1) Mechanical cutting of road verges with a variable width from 1.0 m to 3.0 m (avg. 1.5 m) and an average thickness of 15 cm, achieving a verge slope of at least 6%
2) Removal of excavated soil with disposal within its own scope or incorporation in places indicated by the authorised representatives of the Contracting Authority
3) Additionally, preparatory activities are to be carried out, namely:
a) removal from the road verge of safety devices or other elements, the temporary removal of which will not pose a threat to road safety (e.g. cat's eyes, kilometre and hectometre posts, etc.) and their re-installation after the verge has been cut.
4) The Contractor will agree with the RDW representative on:
a) determining the width of the verge and establishing the edge of the road crown,
b) compacting the surface or breaking up the pavement in necessary cases when cutting the verge,
c) compacting the surface of the verge to a depth of 2 to 3 cm when filling it in for good bonding of the layers
3. The detailed scope of the contract is contained in the attached SWZ for each of the tasks subject to the works and the tender cost estimates.
4. The Contractor is obliged to ensure safe conditions for road traffic, both motor and pedestrian, in the area of the works covered by the contract, on the basis of a traffic organisation project (for the duration of the works) approved by the Road Traffic Manager, transferred to the Contractor. Workers must be dressed in high-visibility vests, and equipment must have flashing orange warning lights. The services must be carried out in accordance with the applicable environmental protection regulations in a way that guarantees the required quality.
5. It is essential that before submitting a tender, the contractor familiarises himself with the place of service provision, in order to assess the actual state, documents and information relating to this procedure, in particular with the places where the cutting is to be carried out.
6. The Contracting Authority reserves the right to check the correctness of the marking of the service being carried out, in accordance with the traffic organisation project referred to in point 5.
7. The Contractor provides all the necessary materials, equipment and personnel required to carry out the contract.
8. The detailed scope of the services is set out in the attached Works Specification and Technical Specification.
9. The Contractor undertakes to conclude at his own expense appropriate insurance agreements for civil liability for the duration of the contract.
10. The insurance covers contractual and tortious civil liability for damages and consequences of accidents involving workers and third parties, arising in connection with the services provided - the required insurance sum is not less than 50,000 PLN per event.
11. Copies of the insurance policies or insurance documents confirmed to be in accordance with the original, the Contractor shall submit to the Contracting Authority for inspection no later than on the day of handover of the contract execution site and subsequently upon each request of the Contracting Authority. Delay in this regard will be treated as having arisen from causes dependent on the Contractor and cannot constitute a basis for changing the contract completion date.
12. The Contracting Authority, pursuant to art. 95(1) of the Pzp Act, requires the Contractor or subcontractor to employ, on the basis of an employment contract, persons performing the following functions: drivers of transport equipment, equipment operators, persons cleaning the surface within the scope of the contract.
13. The Contracting Authority allows the possibility of submitting partial tenders in accordance with the description of the subject of the contract.
14. There is a possibility of invalidating the procedure as a result of the non-granting of funds for the financing of the contract. In accordance with art. 257 of the Pzp Act, the Contracting Authority may invalidate the procedure for awarding the contract if the Public Funds which the Contracting Authority intended to allocate for the financing of the whole or part of the contract have not been granted to it, and the possibility of invalidating the procedure on this basis has been provided for in the contract notice.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Architectural, construction, engineering and inspection services – "Pełnienie nadzoru inżynierskiego nad realizacją projektu wykonawczego branży srk oraz kompleksowych robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów-Szczyrzyc" w ramach Projektu pn.” Budowa nowej linii kolejowej Podłęże-Szczyrzyc-Tymbark/Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka-Nowy Sącz – Etap II
PKP Polskie Linie Kolejowe S.A.PolandArchitectural, construction, engineering and inspection servicesConstruction supervision servicesSupervision of building workDeadline in 11 daysPublished on Nov 19, 2026
Poland – Engineering design services – Opracowanie koncepcji wraz z kompletnymi materiałami do wydania Decyzji o Środowiskowych Uwarunkowaniach dla zadania pn. „Budowa wiaduktu nad linią kolejową nr 009 w Iławie w ciągu dk nr 16”
Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w OlsztyniePolandEngineering design servicesDeadline in 47 daysPublished on Nov 19, 2026
Poland – Architectural services for buildings – KWP Katowice – modernizacja budynków A, B, C, etap I z przystosowaniem do przepisów przeciwpożarowych budynków KWP w Katowicach przy ul. Lompy 19
Komenda Wojewódzka Policji w KatowicachPolandArchitectural services for buildingsEngineering design servicesDeadline in 8 daysPublished on Nov 19, 2026
Poland – Engineering-design services for traffic installations – Opracowanie projektu wykonawczego na budowę sygnalizacji świetlnej wraz z pełnieniem nadzoru autorskiego
Zarząd Dróg Miejskich w WarszawiePolandEngineering-design services for traffic installationsSupervision of building workDeadline in 30 daysPublished on Nov 19, 2026