Skip to content
Back to search

Germany – Engineering design services – Objektplanung Neubau Trasse UW-Oferdingen nach SST-Pliezhausen

FairNetz GmbHGermanyPublished on May 10, 2026
No deadline given

Description

FairNetz GmbH is planning a measure for the power grid connection between the substation (UW) Oferdingen and the new to be built focus substations (SST) Pliezhausen. The aim of the measure is to increase supply reliability and create necessary network capacities in the medium-voltage grid of FairNetz GmbH. Specifically, a cable route (civil engineering and pipe construction) and closed crossings (e.g. flushing drilling method / HDD (Horizontal Directional Drilling - Horizontal Flushing Drilling) for waterways and transport routes are to be implemented. The subject of the present tendering procedure are the services of the project planning (scope of services engineering structures) according to § 43 HOAI (basic services of the performance phases 1 - 8 as well as certain special services).

CPV codes

Engineering design servicesArchitectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders