Skip to content
Back to search

France – Paving and asphalting works – Travaux de reprise surfacique des voiries de la Métropole de Lyon - 2 lots

Métropole de Lyon DGEEPFrancePublished on Nov 17, 2026
32 days left

Description

The present framework agreements with purchase orders are for surface rehabilitation works on the territory of the Métropole de Lyon, divided into 2 geographical lots:

- Lot 1: Communes of the Plateau Nord, Val de Saône, Ouest Nord, Val d'Yzeron and Lyon Rive Droite territories

- Lot 2: Communes of the Rhône Amont, Portes des Alpes, Portes du Sud, Lônes et Coteaux du Rhône, Villeurbanne and Lyon Rive Gauche territories

The works covered by this contract are implemented to delay premature aging of surfaces through preventive techniques and thus avoid major structural rehabilitation works:

- Automatic and Manual Point A (PATA): PATA works aim to temporarily seal the road surface and should be carried out on tiled areas with a non-deformed support. To avoid rejection issues, areas close to shops and parking should be avoided.

- Surface Wearing Coating (ESU): ESU works aim to seal and restore grip to the road surface and should be carried out on cracked or tiled areas with a slightly deformed support or worn coating. To avoid rejection issues, roads with shops and parking should be avoided.

- Cold Laid Bituminous Mixtures (ECF): ECF works aim to seal and restore grip to roads with low or medium traffic and should be carried out on cracked or tiled areas with a slightly deformed support or worn coating. To avoid risks of early-age tearing, parking areas and intersections should be avoided.

- Gravel Emulsion (GE): These surface rehabilitation works are subject to strong meteorological constraints (ground temperature) and can therefore only be carried out during a given period. The works will be defined with the relevant service at the time of ordering and will consist, according to the chosen application (PATA, ESU, ECF, Gravel Emulsion), of:

- cleaning the areas to be treated;

- receiving the areas that have undergone preparatory works (purges) carried out as part of another contract;

- protecting the structures: manholes, inspection chambers and drains;

- shot-blasting the horizontal signage;

- spreading the gravel and binder (PATA);

- laying: emulsion and aggregate layers (ESU), a mixture of sand, gravel and bitumen emulsion in one or two layers (ECF);

- compaction (PATA), pneumatic compaction (ESU and ECF);

- sweeping: lightly immediately after compaction (PATA), to remove excess aggregates (ESU), 72 hours after compaction in urban areas (ECF);

- removing rejects by sweeping or suction 48 hours after the intervention (PATA);

- milling, demolition and/or cutting with a jackhammer of excess bituminous coatings (GE).

It should be noted that the punctual preparation works of the road supports (patching, sprayed coatings, shot-blasting) are not part of the present contract; a specific contract being dedicated to these services. However, hot mix resurfacing works are included in the present contract.

CPV codes

Paving and asphalting worksRoad-repair works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders