Skip to content
Back to search

Norway – Construction work – 2027 Framework agreement Emergency excavation preparedness water and sewage.

Trondheim kommuneNorwayPublished on Nov 08, 2026
32 days left

Description

The framework agreement includes excavation stand-by for acute, planned and planned excavation and water and sewage work managed by Trondheim municipality. The assignments mainly involve repairs to the existing infrastructure as a result of unwanted events such as, for example: water leaks, clogging or collapse of surface water and/or sewage pipelines, replacement of water and sewage manholes in addition to general maintenance of the water and sewage infrastructure. This also results in a return of the ground and surface to the original condition or upgrades in accordance with the current requirements. The case number for the associated market dialogue/RFI is 2026/31042

CPV codes

Construction workSite preparation workDemolition, site preparation and clearance workSite preparation and clearance workPrimary works for servicesExcavating and earthmoving workTrench-digging workEarthmoving workLandscaping work for roads and motorwaysEngineering works and construction worksPipelaying construction workStorm-water piping construction workWorks related to water-distribution pipelinesWater-main refurbishment construction workSewer construction workFoul-water piping construction workDrainage and surface worksDrains construction workRoad construction worksRoadworksRoad-maintenance worksSurface work for streetsSurface work for footpathsIrrigation channel construction workRepair and maintenance of plantReinforced-concrete workEnvironmental improvement works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders