Germany – Construction work for school buildings – Ersatzneubau der Staatlichen Berufsschule in Regen mit FOS: Verkehrswegebauarbeiten Bereiche 1 und 2
Description
Main school building: consisting of basement, ground floor, 1st floor and 2nd floor, approx. 103 m x 87.5 m, height up to approx. 17 m
Metal ancillary building: consisting of basement, approx. 18.5 m x 7.8 m, height up to approx. 5 m
Waste and bicycle storage ancillary building: consisting of ground floor, approx. 17.1 m x 5.2 m, height up to approx. 3.5 m
Heating building: consisting of 1st basement and 2nd basement, approx. 16.75 m x 7.0 m, height up to approx. 8.5 m
Wood/construction ancillary building: consisting of ground floor, approx. 23.15 m x 7.35 m, height up to approx. 5.5 m
Building description:
Structure: basement, stairwell cores and central area/auditorium in reinforced concrete, partly fair-faced concrete, remaining external and internal walls in timber construction, internal walls partly made of gypsum plasterboard, ceilings in timber-concrete composite construction
Facades: timber cladding with insulation behind
Roof construction: flat roof, partly green
Windows and external doors: - metal construction - wood-aluminium construction
Sun protection: roller shutter
Suspended ceilings: made of gypsum plasterboard, partly as gypsum perforated ceilings or wood acoustic ceilings with installations above
Internal doors: - steel frames with wooden door leaf - aluminium-glass construction
Floor coverings: cement screed and coverings made of rubber, parquet and tiles with underfloor heating
Paved outdoor areas: asphalt and concrete paving
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Electrical wiring and fitting work – Elektrotechnik
Bäder Halle GmbHGermanyElectrical wiring and fitting workInstallation of telecommunications equipmentFire-alarm system installation workDeadline in 32 daysPublished on Oct 08, 2026
Germany – Plasterboard works – BLB NRW Köln / Technische Hochschule Köln, Campus Deutz, Neubau Gebäude B, Trockenbauarbeiten
Bau- und Liegenschaftsbetrieb NRW KölnGermanyPlasterboard worksConcrete carcassing workMetalworkingDeadline in 25 daysPublished on Oct 08, 2026
Germany – Site preparation work – VE131 Erdarbeiten (119VM514 / Kronsh,SanDstBw,Ersatzneub. ZInstSanBw)
Bundesrepublik Deutschland endvertreten durch Gebäudemanagement Schleswig-HolsteinGermanySite preparation workDeadline in 32 daysPublished on Oct 08, 2026
Germany – Alarm system and antenna installation work – 36EU/26 - 063.3 Videoüberwachung - Hauptfeuerwache mit Rettungswache und Integrierter Leitstelle
Stadt TrierGermanyAlarm system and antenna installation workVideo-surveillance systemDeadline in 20 daysPublished on Oct 08, 2026