Skip to content
Back to search

Netherlands – Engineering design services for mechanical and electrical installations for buildings – 2025-206 New Cargo Terminal - Installatieadvies

Schiphol Nederland B.V.NetherlandsPublished on Apr 01, 2026
No deadline given

Description

The intention is to relocate the current KLM cargo buildings 1-3 to create space for the further development of Schiphol Centrum. In their place, SRE will realise a new cargo terminal for KLM at Schiphol Oost. This involves a modern and sustainable cargo building with an area of approximately 70,000 to 80,000 m², designed to optimally support KLM's cargo operations in the long term. The contract description concerns the technical building services design from the SO (Schematic Design) based on the Programma van Eisen (hereinafter referred to as PvE) and Conceptual Design, drawn up in cooperation with the future tenant, up to and including a fully tender-ready design (TO) including bill of quantities. The measurements of the building will be between 70,000 and 80,000 m². Furthermore, the works include, among others: • Facilitating the acquisition and promotion of a positive decision-making process by both the client and the tenant regarding phase completion and design proposals; • Involvement during the construction phase up to and including handover and aftercare; • Availability to implement changes in the design; • Design within the frameworks: at least BREEAM Excellent, requirements for Environmental Performance of Buildings, Energy Neutral and Circularity Index to be determined; • Connection of the building to the layout of the land to be developed; • Providing technical building services support to the construction management; • Supporting Project Management and supervision; • The contractor prepares and checks the working drawings with the other advisors for the execution; • The safety and security concept, if applicable, will be formulated in consultation with SRE. The Contract consists, among other things, of the following tasks and responsibilities: The future Contractor and the advisors to be contracted will work closely with SRE's specialists. An exact demarcation of the works will be appended to the Invitation to Register. SRE intends to award the entire design contract, but the Contract will be provided in the following seven phases according to DNR2011: Schematic Design, Preliminary Design, Definitive Design, Technical Design, Environmental Permit and tendering and execution phase. During this phase, the installation advisor will check the execution documents of the installers. SRE reserves the right to amend (parts of) the Contract, as well as to ultimately not provide one or more parts of the Contract.

CPV codes

Engineering design services for mechanical and electrical installations for buildingsEngineering services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders