Skip to content
Back to search

Poland – Construction work – Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów – Szczyrzyc w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II”

PKP Polskie Linie Kolejowe S.A.PolandPublished on Jul 20, 2026
37 days left

Description

The subject of the Contract is the execution of the following elements: The subject of the Contract is the execution of the following elements: Design and execution of works for the task entitled: "Construction of the building object entitled: railway line no. 622 Gdów – Szczyrzyc section G from km 17+487 to km 32+854 together with the technical infrastructure along railway line no. 622 from km 17+036 to km 32+973 and railway line no. 623 sub-section Fornale – Szczyrzyc section G from km 9+668 to km 10+105 together with the technical infrastructure along the railway connection no. 623 from km 9+668 to km 10+105". The entire subject of the Contract includes the execution of the following elements: 1) Design documentation, including: a) development of the executive project, b) development of as-built documentation, including geodetic as-built documentation, 2) and works in the scopes described in the OPZ and PFU: a) track and subgrade, b) drainage and hydrotechnical works, c) external networks, d) roads, e) railway traffic control devices (srk), f) telecommunications devices and systems, g) traction network and power supply and control system, h) non-traction lines (LPN); i) electrical power devices and systems up to 1 kV, j) engineering structures along with related works, including railway tunnels, k) platforms, passenger service facilities and cubature facilities, l) crossings and level crossings, m) geological and geotechnical works, n) works related to the execution of small architecture elements, o) tree and shrub cutting as well as environmental works, p) all other works necessary for the implementation of the task in accordance with applicable regulations. 3) works consisting in the construction of objects serving environmental protection. 4) conducting the conformity assessment process of structural subsystems in the scope covered by the contract at each stage (design, construction and final subsystem tests) and submitting the appropriate declarations of WE verification and WE verification certificates for the subsystems. The Interface Option includes the implementation of cooperation with other contractors carrying out construction works or deliveries for the Contracting Authority, which require linking with railway traffic control devices installed within this task. Cooperation will take place through the Contracting Authority and/or the Engineer. The Contracting Authority envisages that the scope of works carried out within other Contracts affects the need to make changes, inter alia, in the scope of interfaces (i.e. implementation within this task of the Interface Option). The detailed scope of the Interface Option is defined in Section no. 5 of TOMU IV — PFU entitled: "Forecasted changes in the scope of interfaces", which relate to srk devices planned to be installed within this contract. 2. The Detailed Description of the Subject of the Contract is presented in the Subject of the Contract Description constituting Volume III of this SWZ and the Functional-User Program (PFU) constituting Volume IV of this SWZ. 3. The Contracting Authority envisages granting contracts, as referred to in art. 388 item 2) lit. c) of the Act. The scope of contracts, as referred to in art. 388 item 2) lit. c) of the Act and the conditions under which they will be granted is determined by the OPZ and PFU. A similar contract may be granted in the form of a contract from a free hand, following prior negotiations with the Contractor, in particular in the scope of the contract terms including price, execution deadline, guarantee period/handing over period and will concern the repetition of similar executive projects of the srk industry and complex construction works consistent with the subject of the contract in particular in the scopes: a) dismantling and liquidation of railway infrastructure in poor technical condition, devastated, unused cubature objects as well as elements colliding with design solutions, b) execution of construction works covering the track industry with drainage, the industry of engineering structures (including tunnels) along with the execution of hydrotechnical works in their vicinity, the road industry, the electrical power industry, the traction network industry, the traction network power supply industry, the telecommunications industry, passenger service facilities and cubature facilities along with surface drainage of the area, the sanitary industry, the srk industry, c) removal of collisions with networks of various operators.

CPV codes

Construction workEngineering design services for the construction of civil engineering worksOffice and computing machinery, equipment and supplies except furniture and software packagesRadio, television, communication, telecommunication and related equipmentSoftware package and information systemsConstruction work for highways, roadsWorks for complete or part construction and civil engineering workComputer equipment and suppliesTelecommunications equipment and suppliesNetworking, Internet and intranet software packageDatabase and operating software packageInformation systems and serversSite preparation workConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkData-processing machines (hardware)Computer-related equipmentLocal area networkNetwork equipmentWide area networkTransport equipment and auxiliary products to transportationRailway and tramway locomotives and rolling stock and associated partsParts of railway or tramway locomotives or rolling stock; railways traffic-control equipmentRailways traffic-control equipmentInformation systemsServersEngineering works and construction worksConstruction work for water projectsBuilding demolition and wrecking work and earthmoving workConstruction work for railways and cable transport systemsRailway construction worksDemolition of tracksTrack construction worksRailway signalling worksElectrical installation workElectrical wiring and fitting workInstallation of cable infrastructureInstallation of cable layingArchitectural, construction, engineering and inspection servicesEngineering servicesEngineering design servicesNetworksBuilding installation workConstruction and ancillary works for telephone and communication linesConstruction work for electricity power lines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders