Czechia – Electric motors, generators and transformers – Klimaticky odolná živá laboratoř Podluží
Description
The subject of the public contract is the construction of the Climate-Resilient Living Lab Podluží, which will connect 13 municipalities in the region into a single smart infrastructure system. The laboratory will create an open and modular environment for testing and validating innovative technologies in the areas of climate mitigation and adaptation, such as energy, water management, waste management, mobility, public lighting, greenery, and digital services. The key element will be the central data platform EMOS, which will enable data integration, predictive infrastructure management, and simulation of crisis scenarios across the entire region. The project will serve as a model example for other Czech and European regions. After completion, an integrated innovation ecosystem will be created, in which all municipalities will be connected via the EMOS platform. The region will transform into a living lab capable of testing and evaluating technologies at various scales – from small villages to larger towns – and providing high-quality data and a unique environment for research and practice. Municipalities will have the opportunity to predictively manage their infrastructure, effectively cope with crisis situations, and achieve significant savings in the areas of energy, water, and waste. The Podluží region will become a region in the Czech Republic that can address climate challenges in synergy and multidisciplinary – by connecting local authorities, companies, universities, and citizens. Thus, the region will transform into an open "playing field" for technological and process development in public administration, which will be an inspiration for other areas. The public contract consists of 3 implementation circles: I. Circle: I.a EMOS of the Podluží Region – (Energy Management and Optimization System – energy management and optimization system) for selected municipalities of the Podluží Region. The subject is to implement an open architecture of the Podluží Region as a regional data, integration, and control layer for the future development of community energy, property management, and digital technology management in municipalities. I.b EMOS of the municipality of Kostice (Energy Management and Optimization System – energy management and optimization system). The subject is to implement a pilot part for the municipality of Kostice, specifically the deployment of the Data Intelligence module (advanced analytics) and the deployment of autonomous control of selected technologies and resources. The Kostice pilot is intended to serve as a reference and demonstration part of the entire project. The pilot includes, in particular, advanced analytics of consumption and inefficiencies, reporting, simulation of measures, and autonomous control of selected technologies, particularly PV, accumulators, microgeneration, reserved maximums, and other technologies. II. Circle: II. Activity of the energy consultant The subject of this circle is to ensure an expert energy consultant for the field of municipal energy. The energy consultant will methodically lead the municipality, possibly other authorized persons from the municipality or the Podluží Region, in creating an energy concept and implementing a practical energy management system. The implementation also includes practical training for designated persons of the municipality and the Podluží Region to work in the EMOS system, or possibly in another similar energy management system used by the contracting authority, and that to the extent of 250 hours. III. Circle: III. Investment activities of the municipality of Kostice The aim is to create an operationally safe, energy-efficient, and long-term serviceable local energy unit, in which MaR will supervise the production of electricity and heat, accumulation, consumption, and interconnection of existing and new technologies. The solution must be open for future development, must not be dependent on the exclusive remote access of the manufacturer, and must provide the municipality with complete operational data, configurations, and control documentation MaR. The solution includes these areas: • central heat source for solved municipal buildings with preparation for future connection of Sokolovna; • combined production of electricity and heat in KGJ and coordinated operation of bivalent sources; • use of heat in the heating system and TV, accumulation and safe measurement of surpluses with a dry cooler; • integration of KGJ, boilers, PV, BESS, meters, and other related technologies into the common control system MaR/ASŘ; The subject of the public contract is the obligation of the contractor to ensure planned servicing and ordered non-warranty work within 60 months from the acceptance of the work, in the scope and at the prices according to Annex No. 8 Binding Price and Contract Forms for the evaluation criterion C. Model quantities serve to compare offers; the actual number of engine hours, outings, and ordered hours the contracting authority does not guarantee. The prescribed service activities will be paid according to the actual operation and binding unit prices.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Emergency power supplies – 25-153-A Nákup energetických setů
Správa státních hmotných rezervCzechiaEmergency power suppliesChassisDeadline in 61 daysPublished on Oct 20, 2026
Czechia – Electric motors, generators and transformers – Klimaticky odolná živá laboratoř Podluží
Region PodlužíCzechiaElectric motors, generators and transformersDeadline in 11 daysPublished on Oct 18, 2026
Czechia – Electrical apparatus for switching or protecting electrical circuits – G799 - 2.HVB - náhrada ochran SPACOM řady 100
ČEZ, a. s.CzechiaElectrical apparatus for switching or protecting electrical circuitsNo deadline givenPublished on Oct 14, 2026
Czechia – Transformers – Transformátor T1 Lipnice
SUAS Distribuční s.r.o.CzechiaTransformersElectrical installation work of transformersDeadline in 13 daysPublished on Oct 13, 2026