Germany – Building materials – Materiallieferung Wasserwerk
Description
The annual material requirement of the waterworks of the VGW AK-FF is to be covered with this contract. The material is primarily intended for maintenance, repair and expansion work on the water supply network of the VGW AK-FF, to be carried out by the in-house operating personnel. The water supply network of the VGW AK-FF has a total length of approximately 380km and 15,500 house connections. The scope includes, among other things, the supply of: -Pressure pipes -Fitting assemblies -Saddle clamps -Elbows -Castings -PE electrofusion fittings -Push-fit fittings -Street caps -Support plates -Seals -Pipe sealing clamps -Shut-off valves -House connections -Hydrants -Screws -PVC fittings -Water meter chambers -Locking collars -Support sleeves -Pull-proofing The contract is to be concluded for a period of 12 months and can be extended by the Verbandsgemeindewerke Altenkirchen-Flammersfeld three times unilaterally until 31.10. of the previous year for a further 12 months. The maximum call-off volume per 12 months is 300,000 € net.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Profiles – Lieferung von Aluminium-Sonderprofile für 2027
WSW mobil GmbHGermanyProfilesDeadline in 31 daysPublished on Nov 19, 2026
Germany – Modular and portable buildings – Lieferung, Installation, Inbetriebnahme einer technischen Stickmaschine für die Entwicklung von Smart Textiles (Los 1) und einer 1-Kopf-Stickmaschine mit Instant-Garnfärbeeinheit für die On-Demand-Veredlung konfektionierter Textilien (Los 2)
Hochschule NiederrheinGermanyModular and portable buildingsDeadline in 30 daysPublished on Nov 18, 2026
Germany – Masts – Braunschweig Stadtbahn + Teilprojekt 1.2: Wendeanlage Gliesmarode
Braunschweiger Verkehrs-GmbHGermanyMastsDeadline in 31 daysPublished on Nov 18, 2026
Germany – Gas-distribution network – Gas-Verteilnetz für die Hilfsgase Stickstoff und Wasserstoff in der BALIS-Großversuchsanlage
Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)GermanyGas-distribution networkDeadline in 27 daysPublished on Nov 18, 2026