Skip to content
Back to search

Austria – Overhead line construction – Ersatzneubau 110-kV Leitung UW Wiener Neustadt Wasenbruck Teilstrecke Zillingdorf Steinbrunn

Netz Niederösterreich GmbHAustriaPublished on Jan 28, 2026
No deadline given

Description

Replacement new construction of an approximately 7.4 km long 110-kV single-circuit line between the poles No. 32 (approximately existing pole No. 32) and No. 58 (approximately existing pole No. 68) with a total of 27 new support points (M32 – M58). Newly tensioned to the adjacent existing poles M31 and M59. 21 suspension poles 6 guy poles - dismantling of the approximately 7.8 km long 110-kV line between the existing poles No. 32 and No. 68 with a total of 37 support points. 2. Erection of a cable tensioning system for the new Schiltern substation. Cables, fittings and earthing material will be provided by the AG.

CPV codes

Overhead line construction

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders