Poland – Audio-visual equipment – Aranżacja i wykonanie tras turystycznych w podziemiach Sztolni Królowa Luiza.
Description
Name of the order: „Arrangement and execution of tourist routes in the undergrounds of Sztolni Królowa Luiza” Basic information: The order concerns the arrangement and execution of tourist routes in the undergrounds of Sztolni Królowa Luiza. Within one complex of underground works, it is planned to put into use two tourist routes. The route with a theme dedicated to the elements will be fully modernised and upgraded, while the historical-themed route will be a new product. As part of the order, the Contractor is obliged to execute two complete tourist routes, which include arrangement elements (scenography, buildings, etc.), AV equipment, lighting, multimedia content and multimedia installations, ethernet and power networks, and electrical installations. Descriptions of the subject of the order are contained in 4 design documents: 1. Concept and design of a new underground exhibition dedicated to the elements, created on the basis of tourist routes in Sztolni Królowa Luiza along with attachments. Note: Attachment No. 2 to the concept and design contains an update of the minimum technical parameter specifications - replaces the content of project pages 33 – 46 (item 4.3.6. Specifications of minimum parameters). 2. Concept and design of a new underground exhibition with a historical theme created on the basis of tourist routes in Sztolni Królowa Luiza along with attachments. Note: Attachment No. 2 to the concept and design contains an update of the minimum technical parameter specifications - replaces the content of project pages 41- 49, in the scope of minimum parameter specifications. 3. Execution of the project of installations within the newly designed tourist routes located in Sztolni Królowa Luiza in the Museum of Coal Mining in Zabrze (attachments: 3a and 3b to OPZ), 4. Execution of installations within the newly designed tourist routes located in Sztolni Królowa Luiza in the Museum of Coal Mining in Zabrze (electrical industry) – Attachment No. 4 to OPZ – in the part covering: a. purchase and delivery of drainage cables between switchgears RTN-11, 12, 21, 22, 31 31.1, 31.2, 32, 33, 33.1, 41, 41.1 and TN-31, 32, 34, 35 and junction boxes on exhibition stands according to the table (6. Cable list) placed on pages 14-16 of project No. EP7-23-09/E1 (Attachment No. 4 to OPZ), b. laying cables in workings and exhibition chambers, c. connecting cables to TN-S network distributors, d. carrying out the required tests, measurements and acceptance tests enabling their commissioning. Note: The remaining part (excluding the elements listed in points a-d above, which are the subject of the order) of the scope covered in the documentation referred to in point 4 has been implemented as part of a separate contract. With regard to the WiFi wireless network, the Contractor is obliged to select, on a qualitative and quantitative basis, the components of the indicated scope based on the following requirements: - Signal continuity: Full radio coverage without interruptions in the range on the entire length of the routes, - Smooth switching (Roaming): Ensuring uninterrupted connection while moving with a VoIP device (switching between access points must be unnoticeable to the user, without interrupting the ongoing voice connection, - Signal level (RSSI): The signal level at any point on the route must not be worse than -65 dBm, - Signal quality (SNR): The signal-to-noise ratio must be at least 25 dB, - Solution standard: Wi-Fi 7 (802.11be) or Wi-Fi 6 (802.11ax), - Radio standard and band support: Full support for IEEE 802.11a/b/g/n/ac/ax or 802.11be (Wi-Fi 7) standards, - Multi-band operation (parallel support for bands: 2.4 GHz, 5 GHz, 6 GHz), - Ensuring full backward compatibility for wireless devices and VoIP phones working in older Wi-Fi standards. - Security and encryption: Support for the latest security standards: WPA3-Personal, WPA3-Enterprise and support for mixed mode (WPA2/WPA3 Mixed Mode), - Support for management frame protection (PMF / IEEE 802.11w) securing VoIP connections from Deauthentication/Disassociation type attacks. - Support for voice traffic prioritisation QoS, ensuring the priority of VoIP packets over other network traffic. - Construction and environmental resistance: - Dedicated enclosure adapted to the difficult conditions prevailing underground, characterised by a minimum protection class of IP67 (full dust-tightness and resistance to moisture/flooding). - Device power supply carried out in the PoE or PoE+ standard (IEEE 802.3af/at/bt). - Management and configuration: - Possibility of centralised management of the operation of all access points (via a physical controller, virtual or central management system). - Built-in mechanisms for automatic optimisation of radio channels and transmission power depending on the propagation conditions in the workings. Verification of the compliance of the implementation of the subject scope with the contractual requirements will be carried out on the basis of measurements of network parameters carried out by the Contractor and technical documentation of the installed devices. In connection with the above, the description of the operational properties indicated above becomes mandatory for Contractors – which replaces the previous description of the subject of the order for the wireless network – included in attachment 3a and attachment 3b. The order does not include: AD.1.1 Stand 15 Obwał is excluded from the procedure AD.1.2 The implementation of content for Stand 17 and 18 is excluded from the procedure. The complete musical piece will be handed over for the implementation of the stands after signing the contract with the Contractor. AD.2.1 The transport device is excluded from Stand 5 Conveyor Belt – Listening Booth AD.2.2 Stand 23 In the queue Karlik (content) is excluded from the procedure. Both Stand 15 Obwał and the delivery and installation of the transport device will be covered by separate procedures. The detailed description of the subject of the order is contained in attachment 2 to SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Data-transmission equipment – Przedmiotem zamówienia jest zaprojektowanie i wykonanie multioperatorskiej instalacji wzmacniającej sygnał telefonii komórkowej z dostawą, rozmieszczeniem i zainstalowaniem montażem niezbędnych urządzeń transmisyjno-odbiorczych (anten) oraz stacji obsługi (BTS) i uruchomieniem systemu, której zadaniem jest pokrycie sygnałem LTE/GSM w budynkach na terenie Filii nr1 Szpitala Wojewódzkiego w Poznaniu
Szpital Wojewódzki w PoznaniuPolandData-transmission equipmentTelephone and data transmission servicesSatellite communications equipmentDeadline in 39 daysPublished on Nov 25, 2026
Poland – Audio-visual equipment – Dostawa i wykonanie Studia nagrań, Studia montażowego oraz Centrum Streamingowego w Uniwersytecie Pomorskim w Słupsku
Uniwersytet Pomorski w SłupskuPolandAudio-visual equipmentMultimedia equipmentVideo camcordersDeadline in 14 daysPublished on Nov 25, 2026
Poland – Network infrastructure – Dostawa klastra urządzeń bezpieczeństwa sieciowego Next-Generation Firewall (NGFW) wraz z oprogramowaniem, wsparciem technicznym oraz usługą wdrożenia i relokacji urządzeń.
Wojskowy Instytut Medyczny – Państwowy Instytut BadawczyPolandNetwork infrastructureSecurity software packageTelecommunications cableDeadline in 7 daysPublished on Nov 25, 2026
Poland – Communications equipment – Standaryzacja stanowisk do elektronicznej rejestracji danych identyfikacyjnych osób
KOMENDA GŁÓWNA POLICJIPolandCommunications equipmentInformation systems and serversDisplay screensDeadline in 22 daysPublished on Nov 25, 2026