Netherlands – Quay wall construction work – Duurzame kadevervanging Uilebomen-Boomsluiterskade
Description
Under the Multi-Year Artworks Programme (MJPK), the quay walls at Uilebomen and Boomsluiterskade must be replaced. The Uilebomen (UIL) and Boomsluiterskade (BSK) are located in the Centrum district, in the Rivierenbuurt-noord neighborhood. The quays are divided into two water compartments and 4 sections; two short sections and two long sections. The short sections are located between bridge 49 at Pletterijkade and bridge 58 - Nieuwe Havenbrug. The long sections are bounded by bridge 58 – Nieuwe Havenbrug and the Zwarteweg and Boomsluiterskade. Additionally, partial sewer works will be carried out, the ground level will be renewed, and the pedestrian bridge 455, at the corner of the Zwarteweg/Boomsluiterskade, will be replaced. For this assignment, the requirement is that all works within the construction barriers (the work area) must be carried out 100% emission-free. From the integral project, the following works are carried out:
1. Replacement of quay wall
The replacement of the quay wall on both sides of the Uilebomen and Boomsluiterskade on both the short and long sections of the streets. This can be globally divided into the following 4 parts:
• Uilebomen short section: 82 meters
• Boomsluiterskade short section: 82 meters
• Uilebomen long section: 206 meters
• Boomsluiterskade long section: 212 meters
2. Sewerage
In the short section of the Boomsluiterskade, the main sewer must be replaced over a length of approx. 90 meters. In addition, the house connections must be replaced on the short section of the Boomsluiterskade and the long and short section of the Uilebomen. At Uilebomen, an additional surface water sewer will also be laid (approx. 95 meters in the short section and approx. 135 meters in the long section)
3. Ground level arrangement
The ground level must be redesigned/renewed over the full length of all four quay wall sections from facade to quay, including the intervening ground level on both sides of bridge 58 – Nieuwe Havenbrug and the ground level on the bridge.
4. Pedestrian bridge – bridge 455
In the long section of the project area (at Zwarteweg/Boomsluiterskade) the wooden pedestrian bridge must be replaced.
5. Wing walls
Repair works must be carried out on the wing walls of bridge 58 – Nieuwe Havenbrug and the wing walls of bridge 49 – Pletterijkade. By repair works is meant: restoration of masonry and/or repair of cracks.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Netherlands – Paving and asphalting works – Raambestek asfaltonderhoud 2027 - 2030 Gemeente Oldenzaal
Gemeente OldenzaalNetherlandsPaving and asphalting worksRoad-maintenance worksDeadline in 56 daysPublished on Sep 06, 2026
Netherlands – Site preparation work – Bouwteam BRM Nieuwe Veemarkt Zwolle
Gemeente ZwolleNetherlandsSite preparation workConstruction work for bridgesConstruction work for waterwaysNo deadline givenPublished on Sep 03, 2026
Netherlands – Road construction works – Bestek 2599 Asfaltonderhoud 2027 - 2030
Provincie GelderlandNetherlandsRoad construction worksDeadline in 43 daysPublished on Sep 03, 2026
Netherlands – Surface work for roads – Groot onderhoud elementenverharding (>200m2)
Gemeente Den HaagNetherlandsSurface work for roadsPaving and asphalting worksDeadline in 51 daysPublished on Sep 03, 2026