France – Sewage-treatment plant construction work – Construction d’une nouvelle station de traitement des eaux usées-.
Description
The procedure is a restart of procedure 2023DP09, which covered the same subject and was declared unsuccessful. The present operation concerns the reconstruction of the wastewater treatment plant in Mesnil-Saint-Père. The load to be treated at this plant is highly dependent on tourist activity. Between winter and summer, the raw organic pollution load can vary from 640 PE to 2 500 PE, with highly variable loads from one day to the next during the intermediate period. To address this specificity, and in line with the discharge objectives imposed, the treatment line envisaged is of the SBR ("Sequencing Batch Reactor") type. The sludge line must allow for the production of paste-like sludge to be stored in skips. During the works, the continuity of treatment of the installation must be taken into account.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Overhaul and refurbishment work – MODIFICATION et REHABILITATION DE BUREAUX SUR L'AGENCE DE ST AMAND MONTROND
France LoireFranceOverhaul and refurbishment workStructural shell workJoinery workDeadline in 21 daysPublished on Oct 29, 2026
France – Road-maintenance works – TRAVAUX D’AMENAGEMENT DES ESPACES PUBLICS DU QUARTIER DE CHASSE ROYALE PHASE 3 SUR LES COMMUNES DE VALENCIENNES ET DE LA SENTINELLE
COMMUNAUTE D'AGGLOMERATION VALENCIENNES METROPOLEFranceRoad-maintenance worksNetworksRoad lightsDeadline in 31 daysPublished on Oct 29, 2026
France – Building construction work – Marché de travaux d'installation d'un système de VMC et de remplacement des chauffe-eau par des BECS Résidence Mirgaudon 91530 - Saint Chéron
BATIGERE HABITAT, Ile de FranceFranceBuilding construction workVentilation installation workDeadline in 18 daysPublished on Oct 29, 2026
France – Construction work – Travaux de gros entretien des couvertures tuiles des trois bâtiments : D2-E1 et E2, résidence Le Village à Eysines
AquitanisFranceConstruction workDeadline in 13 daysPublished on Oct 29, 2026