Netherlands – Construction work – 37972 | Realisatie afmeercapaciteit Berghaven complex Nieuwe haven te Den Helder
Description
The scope of the present contract consists mainly of the realisation of:
- 1x 150 m1 + 2x 180 m1 sea defence with a retaining height* of approximately 18 metres;
- 1x 300 m1 sea defence with a retaining height* of approximately 19 metres;
- related provisions such as:
- sewage pipes and installations for pumping bilge water from ships;
- water pipes and installations for supplying drinking and fire-fighting water;
- the construction of a caisson area, lay-by areas, access roads and parking spaces (total approximately 60,000 m2);
- dredging works, coastal and bank protection (soil protection).
* By retaining height is meant the difference between the construction depth and the top of the sea defence. See tender guidance registration phase.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Netherlands – Road-maintenance works – Herstraten nutssleuven in elementenverharding (perceel 1) en Onderhoud elementenverhardingen (perceel 2) twee raamovereenkomsten
Gemeente AssenNetherlandsRoad-maintenance worksFlatworkLaying of pavingDeadline in 74 daysPublished on Oct 22, 2026
Netherlands – Engineering works and construction works – Beheer en onderhoud Zuider- en Noorderstrand 2027-2030
Gemeente Den HaagNetherlandsEngineering works and construction worksWorks for complete or part construction and civil engineering workFlatwork for recreation installationsDeadline in 47 daysPublished on Oct 22, 2026
Netherlands – Construction work – Raamovereenkomst Bouwkundig Aannemer ‘meerjarige vervanging in standaard Liften en Roltrappen’
GVB Infra B.V.NetherlandsConstruction workWorks for complete or part construction and civil engineering workNo deadline givenPublished on Oct 21, 2026
Netherlands – Construction work – Europese niet-openbare aanbesteding Verbouw en nieuwbouw De la Reyschool in Den Haag
"De Haagse Scholen", stichting voor primair en speciaal openbaar onderwijsNetherlandsConstruction workBuilding installation workNo deadline givenPublished on Oct 21, 2026