Skip to content
Back to search

Germany – Sanitary fixture installation work – Sanitär, 2024 KHK, Sanierung der Kunsthalle zu Kiel

Christian-Albrechts-Universität zu KielGermanyPublished on Sep 20, 2026
24 days left

Description

Brief description Sanitary: Conversion of the sanitary installation. As part of the renovation and re-use of the Kunsthalle Kiel, the supply networks for drinking water and wastewater will be renewed throughout the building. The existing installation, including sanitary objects and main pipes, will be renewed. To supply the plant technology KG430 (feeding the steam air humidifiers), a VE system is planned in the central technology 01, UG.043. All internal rainwater pipes will be renewed up to the connection to the main pipe above the base plate. In the courtyard area, 2 new emergency outlets with free discharge, pipe-guided through the facade to open space, will be provided in the heating access area UG.042. All external rainwater pipes fall within the scope of the building construction. - Approx. 950m drinking water pipe stainless steel pressed - Approx. 500m wastewater pipe polypropylene pipe with socket (PP pipe) - Approx. 240m rainwater pipe (SML / PE welded in depot areas)

CPV codes

Sanitary fixture installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders