Skip to content
Back to search

Germany – Architectural, engineering and planning services – Brandschutztechnische Ertüchtigung und Ausbau Barrierefreiheit Walzbachhalle Weingarten - Objektplanungsleistungen

Gemeinde Weingarten (Baden)GermanyPublished on Mar 26, 2026
No deadline given

Description

The building complex, erected in 1965 at Kanalstr. 69 (Parcel 19855, Weingarten Baden), consists of two parts: the Walzbachhalle, a multipurpose hall with a stage for sporting and cultural events with up to 684 people, and the Walzbachbad, a swimming hall with a sauna area and an outdoor pool with an outdoor pool. The multipurpose hall and swimming pool are used for both public and school purposes. On the northwest side on Kanalstraße, the building complex is accessed at ground level, between the multipurpose hall and the swimming pool, via a main entrance and a shared foyer. From the foyer, an open staircase, half a floor offset, leads to the main corridor on the ground floor and to the basement. The main corridor separates the assembly hall and the swimming pool on the ground floor. Visitors reach the changing rooms of the swimming pool on the ground floor and the sauna in the basement via a second staircase with a turnstile system in the foyer. On the ground floor are the multipurpose hall with ancillary rooms and changing area, as well as the swimming hall with staff rooms, ancillary rooms and changing areas. The visitor WC facilities, the sauna area with outdoor space, the cultural room, storage rooms and the technical rooms are located in the basement. On the rear side of the building there are three further, non-public accesses, which lead into the building via external stairs. They are mainly used by the staff and as escape routes. The fire service access point with key depot is also located at the southeast hall entrance. The facility has been continuously adapted over time. Most recently, renovation measures were carried out in the years 2006 - 2009 to continue to meet the requirements of sport and culture. Scope of the measure: 1. Fire protection renovation Technical and structural fire protection deficiencies have been identified and addressed in the building complex. Since the Walzbachhalle is an assembly hall with increased fire protection requirements, a fire protection expert was commissioned to develop a fire protection concept for the entire building complex. This fire protection concept specifies the requirements relating to fire protection and describes the planned measures. In case of deviations, suitable compensatory measures are described and justified. The fire protection concept has been coordinated with the Fire Protection Authority and has already been approved by the Karlsruhe District Office. The approved fire protection concept will be further developed on the basis of the submitted planning and will serve as the basis for implementing the fire protection measures to be carried out in the building. 2. Accessibility The existing building, with Walzbachhalle and Walzbachbad, is currently only accessible via various staircases inside and outside the building. To make the building accessible, one of the existing revolving doors at the main entrance will be renewed and equipped with a drive. In the foyer, a barrier-free lift will be installed, designed to also enable the transport of loads in the building between the ground floor and the basement. Via the new lift, barrier-free access to the main corridor on the ground floor is provided, which leads both to the multipurpose hall with changing area and barrier-free visitor WC, as well as to the new barrier-free changing and shower area of the swimming pool. The barrier-free changing and shower room is currently located on the ground floor, within the general changing area. The existing room does not meet the requirements for barrier-free changing rooms, showers and WC in terms of size, equipment and accessibility. A conversion and barrier-free access is not possible within the existing changing area. Therefore, the new barrier-free changing room with shower and WC will be installed within the swimming pool in the area of two unused storage rooms. The spatial proximity to the pool master area enables support on short notice if required. The costs (as of 10/2025) amount to: LOT 300 1,217,559.81 € gross LOT 400 1,785,000.00 € gross The performance phases 1-4 have already been completed. It is assumed that the building permit for the start of the tendered planning services will be available. The subject of this tender are the object planning services for buildings according to §§ 33ff. HOAI with the performance phases 5-9. The implementation of the fire protection renovation and the barrier-free conversion must be completed by the end of 2026. Therefore, planning services must be started immediately after the order. You will find the approval plans in the documents.

CPV codes

Architectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders