Skip to content
Back to search

Germany – Road construction works – Grundhafter Ausbau der Wallrothstraße mit statischen Hangsicherungen sowie Neubau eines gemeinsamen Geh-/Radweges in 99734 Nordhausen; 2. Bauabschnitt

Stadtverwaltung NordhausenGermanyPublished on Oct 18, 2026
31 days left

Description

The city of Nordhausen is carrying out a comprehensive reconstruction of the Wallrothstraße. The measure will be carried out in several construction sections. In the 1st construction section (Station 0-085 to 0+340), the reconstruction including a new rainwater canal has already been completed. With this procedure, the construction services for the 2nd construction section from construction km 0+340 to construction km 0+508 are tendered (listed in this notice under point 5 as LOT-0001). The road runs in this section in a pronounced slope. The valley-side slope is not stable; the stability is ensured by three civil engineering structures, which form the focus of the measure: - an intersecting bored pile wall from Station 0+400 to 0+508, length approx. 108 m, developed wall area approx. 1,350 m², large bored piles according to DIN EN 1536 with D = 88 cm, anchored back with 29 micropiles according to DIN EN 14199; on top of which a head beam and cap made of reinforced concrete, - a steel reinforced concrete retaining wall from Station 0+420 to 0+508, length approx. 90 m, - a slope stabilisation in reinforced earth with geogrids from Station 0+340 to 0+400. In addition, there is the comprehensive road reconstruction including surface water drainage, a shared footpath and cycle path, which is sectionally guided over the cap of the bored pile wall, a crossing aid with ground indicators, the street lighting as well as the adaptation of the mountain-side forest path. Special conditions for execution: - The construction area is suspected of containing ordnance; a probe must be carried out before earth and drilling work. - Beneath the existing carriageway there is a packing layer contaminated with polycyclic aromatic hydrocarbons. The guidelines C 316 and TRGS 551 apply to its removal. - A medium-voltage line of the local network operator, which is in operation, runs through the construction area and must be secured during the construction period. - The tree felling and clearing work is subject to the binding under § 39 Abs. 5 BNatSchG and is only permitted outside the period from 1 March to 30 September. - The working level for the bored pile work is the existing carriageway with a paved width of approx. 5.65 m. The construction measure will be carried out in three temporally separate execution sections: - Section 1: Tree felling and shrub work, 18.01.2027 to 28.02.2027. - Section 2.1: Main construction measure, 03/2027 to 12/2027. - Section 2.2: Completion of the main construction measure, 04/2028 to 06/2028. Work is paused between Section 1 and Section 2.1. The winter break starts from 18.12.2027 between Section 2.1 and Section 2.2. No further division of the service advertised here into lots is planned.

CPV codes

Road construction worksSupporting walls

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders