France – Restructuring work – Travaux de restructuration du collège Rosa Parks à Amiens (partie collège définitif)
Description
The contract is divided into 20 lots. Lots No. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 19 and 20 include a mandatory clause for the insertion of disadvantaged people in accordance with Article R.2111-10 of the Public Procurement Code. No division into tranches is planned. The contract is divided into 3 phases defined in the « Planning prévisionnel » document, broken down as follows:
- Phase No. 1: Restructuring and extension of the college
- Phase No. 2A: Demolition and external arrangements
- Phase No. 2B: Construction of housing and external arrangements
Contract duration: from the notification of the contract until the perfect completion of the works.
Overall work execution period: The overall work execution period is set at 33 months, equal to the sum of the execution periods per phase of work. This overall period includes the 2-month preparation period for Phase 1 and the 1-month preparation period for Phases 2A and 2B. The execution periods specific to each of the lots fit into this overall period, in accordance with the detailed execution schedule that will be established at the start of the site and notified by order of service.
Work execution period per phase: The execution periods for each of the phases are as follows:
- Phase 1: 20 months, from the date indicated in the order of service to start Phase 1
- Phase 2A: 5 months, from the date indicated in the order of service to start Phase 2A
- Phase 2B: 8 months, from the date indicated in the order of service to start Phase 2B
Variants are not allowed. Variants are not required.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Waterproofing work – Mise en place d'une alarme incendie de type 1 et d'un système IEAG d'extinction automatique sur la future agence aquitanis Bordeaux Nord
AquitanisFranceWaterproofing workFire-alarm systemsDeadline in 20 daysPublished on Nov 16, 2026
France – Construction work for water projects – 31 BAZACLE – Continuité écologique : amélioration dévalaison piscicole à l’usine du Bazacle (31)
HYDROSTADIUM SAFranceConstruction work for water projectsLow- and medium-voltage cableElectromechanical equipmentNo deadline givenPublished on Nov 16, 2026
France – Marine construction works – PROJET DEOS - CONCEPTION/REALISATION DES INFRASTRUCTURES PORTUAIRES POUR LE DEVELOPPEMENT DE L'EOLIEN OFFSHORE
GRAND PORT MARITIME DE MARSEILLEFranceMarine construction worksNo deadline givenPublished on Nov 16, 2026
France – Construction work – Travaux de réhabilitation de 145 logements « Sérons » à Dax
XL HabitatFranceConstruction workDeadline in 27 daysPublished on Nov 16, 2026