Switzerland – Construction work – Ponte Rià de la Molera
Description
The Italian road H13, in the section corresponding to the locality of Sorte, is an important road infrastructure affected by flood protection measures, decided following the flood events of June 2024. In this context, in order to improve the hydraulic safety of the area and ensure adequate water drainage in case of flooding, the construction of a new hydraulic crossing structure along the Italian road, near Sorte, is planned. The new structure is intended to ensure water drainage in case of overload of the existing system, while, under normal conditions, drainage will continue to occur in the current channel. The new bridge "Ponte Rià de la Molera" is an integral part of the new hydraulic crossing structure planned for Sorte and allows road traffic to cross it.
CPV codes
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Construction work – Sportanlage Heerenschürli, Instandsetzung KR2–KR4 - BKP 424 Kunstrasen
TED - Grün Stadt Zürich (GSZ)SwitzerlandConstruction workDeadline in 26 daysPublished on Nov 11, 2026
Switzerland – Excavating and earthmoving work – TWL Altbach
Werke Wangen-BrüttisellenSwitzerlandExcavating and earthmoving workTrench-digging workAncillary works for pipelines and cablesDeadline in 19 daysPublished on Nov 11, 2026
Switzerland – Construction work – 748 Valserstrasse Hohe Brücke Baumeisterarbeiten
Tiefbauamt GraubündenSwitzerlandConstruction workDeadline in 14 daysPublished on Nov 11, 2026
Switzerland – Electrical installation work of heating and other electrical building-equipment – BKP 241-243 Instandsetzung Heizung SPZ Sihlhölzli
HBD - Immobilien Stadt Zürich (IMMO)SwitzerlandElectrical installation work of heating and other electrical building-equipmentDeadline in 54 daysPublished on Nov 11, 2026