Skip to content
Back to search
This tender has expired.

Germany – Load-bearing structure design services – Neubau Betreuungsgebäude für Ganztagesschule in Balingen Frommern - Tragwerksplanung

Stadtverwaltung Balingen Amt für Hochbau-und GebäudewirtschaftGermanyPublished on Feb 15, 2026
No deadline given

Description

Within the procurement procedure according to VgV, a suitable office for structural engineering for the new construction of a care building for the Balingen Frommern school association is to be found. The city of Balingen intends to construct a new building on the property of the Frommern school association, which will be used for the care of elementary school children as a full-day school. The building will be erected on the currently existing parking lots in the northern area of the school grounds. This is a two-story building without a basement, which is planned in hybrid construction (wood/ concrete). The roof will be designed as a flat roof, with extensive greening and a PV system. The building consists of themed rooms for children to play and stay, a kitchen with a living room and the necessary ancillary rooms (sanitary and office). To ensure barrier-free access, the building will have an elevator. On the ground floor, there is also a planned recess as a covered terrace area. The kitchen is not the main kitchen. The children will be supplied via the existing canteen. During the holidays and in the afternoon, the planned kitchen in the new building should also be used for cooking and baking. No ventilation system is to be planned, only the toilet rooms could be equipped with ventilation. The planning of the architectural services will be carried out by the Balingen Building Authority. The building application will be submitted at the end of February 2026 and made available to the bidders for the 2nd phase. According to the current status, the start of construction is planned for early 2027. Completion and settlement must be completed by the end of March and April 2029 at the latest. If this deadline is not met and funding is lost as a result, this can result in claims for damages that can be asserted against the person(s) causing the delay. The planning will begin immediately after the order has been placed. The total gross floor area is 1,032 m² (ground floor: 516 m², upper floor: 516 m²). The total gross volume is 4,000 m³. Currently, approximately 3 million EUR gross is budgeted for cost group 300 and approximately 0.9 million EUR gross for cost group 400. Bidding as a consortium is possible (the form 234 must be completed accordingly). For consortiums, the information and references apply in total for the ARGE. The reference is also considered fulfilled if the service was provided as the responsible project manager in another office. In this case, a written confirmation from the other office or the client must be submitted regarding the responsible project management (the form I.3 EU must be completed).

CPV codes

Load-bearing structure design services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders