Germany – Engineering design services – Schöpfwerk Niendorf - Ersatzneubau
Description
The NLWKN intends to award the planning services for the replacement new construction of the Schöpfwerk Niendorf (Amt Neuhaus) with the lots 1 "Environmental Planning" and 2 "Civil Engineering Structure". Please refer to the enclosed tender conditions with attachments and the description of services for more information. The award procedure will be conducted as a "negotiated procedure with competitive dialogue" in accordance with § 17 Vergabeverordnung (VgV). You can now apply to participate in the negotiated procedure as part of the competitive dialogue through the awarding authority's portal. Please complete the documents for the competitive dialogue uploaded under the "Participant Documents" tab and upload the required documents in the awarding authority's portal. A list of the required tender documents can be found in Annex 2 Tender Form under No. 1.3. The Schöpfwerk Niendorf was built in the 1960s in the GDR and drains the catchment area of the Krainke with approximately 12,240 ha. It thus protects residential areas and agricultural land from Elbe floods and backwater into the Sude or from independent floods of the Sude. The right Krainkedeich connected to the pumping station was adapted to the height of the new design flood in 2014. The renovation and height adjustment of the left Krainkedeich was carried out in 2016. An adaptation to the new design water levels has not yet been carried out in the area of the pumping station, so that there are deficiencies of 30 cm. Six installed propeller pumps have a total capacity of approximately 11.7 m³/s, the pumps date from the time of construction in 1963 and are partly in poor condition, two pumps were renewed in 2005 and 2006. A screen cleaning system is not available. In addition, the pumping station has 4 free-flow channels, which serve for regular drainage outside flood periods, although these do not meet the requirements for permeability according to the WRRL. In 2016, a needs assessment was carried out, with the result of carrying out a major overhaul. Since 2021, engineering services for phases 1 to 3 and parts of 4 have been provided for the planning of the major overhaul. Various components of the pumping station were examined in more detail as part of the planning: concrete, plaster, pressure pipelines, sewer, etc. The result of the planning showed that almost all plant components of the pumping station would have to be renovated, replaced or newly built. Due to the foreseeable extensive maintenance effort, a feasibility study was carried out in 2025 to determine whether a replacement new construction of the pumping station could represent a technically and economically better solution than a renovation of the existing structure. Based on the previous planning and the results of the 2025 feasibility study, the NLWKN intends to replace the existing pumping station with a state-of-the-art new building at the site of the existing pumping station. The new pumping station is to meet the current requirements for the design water level, permeability and fish-friendly and economical operation. In addition, the pumping capacity is to be increased to take account of climate change. The following inland water levels are to be ensured by the pumping station:
- maximum permissible inland water level: +7.80 mNHN
- highest winter water level +7.70 mNHN
- highest summer water level +7.40 mNHN
- lowest inland water level +7.20 mNHN
The design flood is currently at 10.60 m+NHN and the corresponding design height of the dike, taking into account a freeboard of 70 cm, is at +11.30 mNHN. The following discharges are to be discharged by the pumps of the pumping station, provided that the external water level is above the internal water level:
- highest flood discharge HHQ: 11,142 m³/s
- design flood discharge: 11,30 m³/s
- design flood discharge taking into account the climate adaptation factor: 13,715 m³/s
- summer mean water discharge SMQ: 2,076 m³/s
The pumps must be designed for geodetic delivery heights between 0.00 m and 3.20 m. These boundary conditions must also be taken into account in the planning of the free flow and the associated fish pass to ensure the inland water levels and permeability. The current Schöpfwerk Niendorf is located in various nature conservation areas:
- Biosphere Reserve "Niedersächsische Elbtalaue" (location of the technical structure within area part A, immediately adjacent to the strictly protected area part C)
- FFH area "Elbeniederung zwischen Schnackenburg und Geesthacht"
- EU Bird Sanctuary "Niedersächsische Mittelelbe" (location of the technical structure outside the EU Bird Sanctuary, but immediately adjacent to the EU Bird Sanctuary)
- Cohesion safeguard measure for the fish species bitterling and stone loach in the immediate vicinity
The relevant nature conservation regulations must be taken into account in the planning.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Architectural, construction, engineering and inspection services – ENTEGA AG - Erweiterung Heizwerk Babenhausen Luftwärmepumpe Kaisergärten Babenhausen Dekarbonisierungsschritt 1 Luftwärmepumpe Los 2.1: Gebäude und Freianlagen Erweiterung Heizwerk Babenhausen Luftwärmepumpe Grundleistungen bei Gebäuden, Leistungsbild nach HOAI §34, sowie die Grundleistungen bei Freianlagen, Leistungsbild nach HOAI §39, sowie optionale besondere Leistungen.
ENTEGA AGGermanyArchitectural, construction, engineering and inspection servicesNo deadline givenPublished on Nov 19, 2026
Germany – Health and safety services – Cloppenburg_Sicherheitstechnische_Betreuung
Landkreis CloppenburgGermanyHealth and safety servicesDeadline in 45 daysPublished on Nov 19, 2026
Germany – Architectural, construction, engineering and inspection services – 2026-0413, SGP - Wiederkehrende Prüfungen und Hygieneinspektionen an raumlufttechnischen Anlagen im Stadtgebiet für 3 Jahre
Stadt Leverkusen - Fachbereich Recht und VergabeGermanyArchitectural, construction, engineering and inspection servicesDeadline in 5 daysPublished on Nov 19, 2026
Germany – Geotechnical engineering services – RV fachgutachterliche Bearbeitung von Grundwasserverunreinigungen 2027-2032
Landeshauptstadt Düsseldorf, Der Oberbürgermeister, Amt für Recht, Vergabe und Versicherungen, Zentrale VergabestelleGermanyGeotechnical engineering servicesSubsurface surveying servicesNo deadline givenPublished on Nov 19, 2026