Germany – Construction work – Neubau Campus Zentralklinikum Magdeburg – NCZMD - HLS-Ausführung – Technische Ausrüstung (Heizung – Lüftung - Sanitär)

IPS Immobilien- und Projektmanagementgesellschaft Sachsen-Anhalt mbHGermanyPublished on Jan 28, 2026
No deadline given

Description

The Universitätsklinikum Magdeburg A.ö.R. (UKMD), together with the Medizinische Fakultät (FME) of the Otto-von-Guericke Universität (OvGU), forms the Universitätsmedizin Magdeburg (UMMD). This collaboration unites research, teaching (FME) and patient care (UKMD). With approximately 1,100 beds, the Universitätsmedizin is the largest hospital in the city of Magdeburg and the largest medical facility in northern Saxony-Anhalt. The clinic's physical structure is characterised in particular by decentralisation. The main campus, with a total area of approximately 300,000 sqm, is located at Leipziger Straße 44. The Universitätsklinik für Frauenheilkunde, Geburtshilfe und Reproduktionsmedizin and the inpatient department of the Universitätsaugenklinik are located at the external site at Gerhart-Hauptmann-Straße 35 (approx. 3 km as the crow flies). The main campus is characterised by a pavilion structure. Clinics, outpatient departments, laboratories, logistics, as well as research and teaching, are decentralised across the site. In total, there are 26 clinics and 19 institutes, as well as other independent or affiliated departments, spread across both sites. In addition to research and teaching, the Universitätsmedizin Magdeburg offers the full spectrum of a multiprofessional and highly specialised medical maximum care. The entire Universitätsmedizin employs approximately 4,300 employees in research, teaching, patient care and administration. In addition, approximately 1,500 students are enrolled at the Medizinische Fakultät and others in the Master's programme in Immunology. The current physical structure of the UKMD is characterised by a dislocated building structure, outdated technical infrastructure, long distances and outdated functional structures. There is an urgent need for action to prepare the UMMD for the future challenges of university medicine and to solve pressing structural problems. The new central hospital is intended to bring together the previously dislocated clinics and functional units of the Universitätsklinikum in a centralised and functionally optimised structure, thus resolving an outdated situation. Taking into account the existing areas in buildings 60a and 60b, most of the clinical areas and a majority of the total usable areas of the UKMD will be located in the Zentralklinikum complex in the future. The construction of the "New Campus Zentralklinikum" is the largest construction project in the state of Saxony-Anhalt and is critical to the future viability of the site at Leipziger Straße. The planning and construction implementation is divided into several individual, interdependent sub-projects. Due to the complexity of the construction measures and the heterogeneous nature of the projects, this is necessary both in terms of content and organisation. The current approved budget for the overall project is approximately 1 billion €, of which approximately 650 million € is allocated solely to the new construction of the Zentralklinikum (construction phases 1 and 2). The focus of the building function should be on the harmony of medically up-to-date and future-proof processes, efficient operational structures and economical solutions. In addition, the following requirements must be mandatorily taken into account: • It must be ensured that modern, safe, competitive and legally compliant healthcare is possible at the site of the Universitätsmedizin Magdeburg and that current safety risks are minimised. • The planning must be future-proof and innovative. • The highest possible level of automation must be taken into account. • The planning of the Zentralklinikum must be carried out in such a way that a highly flexible building is created. This flexibility should enable re-use by other medical specialties; if necessary, even as a result of a changed medical strategy. The most complex and medically important project is the new construction of the new central building for inpatient care, which, according to the specifications of the existing master plan, directly adjoins the existing buildings 60a and 60b and is intended to form a unit with them. The new central building is a highly complex project in planning, execution and operation, but also in the preparation of the procedure, with multifactor dependencies and a large number of users. It is also challenging to integrate the new building into the existing structures, taking into account existing, partially listed buildings. Due to the complex requirements for the new construction of the Zentralklinikum, the client, IPS GmbH, has decided to implement this part of the overall project as an Integrated Project Delivery (IPA). The following IPA partners will be commissioned for planning and execution, with the key trades being tendered in packages and successively: Key trade 1: ELT execution: Publication on 19.01.2026 Key trade 2: HLS execution: This notice Key trade 3: TGA planning: Scheduled publication on 10.02.2026 Key trade 4: Architectural design including fire protection: Scheduled publication on 27.02.2026 Key trade 5: MSR/GLT planning and execution: Scheduled publication on 13.03.2026 Key trade 6: Medical technology planning and execution: Scheduled publication on 27.03.2026 Key trade 7: Structural design: Scheduled publication on 14.04.2026 Key trade 8: Construction services: Scheduled publication on 28.04.2026 Key trade 9: Construction services extended shell/special civil engineering: Scheduled publication on 13.05.2026

CPV codes

Construction workConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkStructures construction workHospital facilities construction workBuilding extension workHeating, ventilation and air-conditioning installation workWater plumbing workDrain-laying workSanitary fixture installation workMechanical engineering installation worksOther electrical installation workConstruction work for buildings relating to health

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders