Skip to content
Back to search
This tender has been withdrawn.

Poland – Construction work – Modernizacja energetyczna infrastruktury ochrony zdrowia w województwie Lubuskim (ETAP I), termomodernizacja budynków Wielospecjalistycznego Szpitala Wojewódzkiego w Gorzowie Wlkp. Sp. z o.o.

Wielospecjalistyczny Szpital Wojewódzki w Gorzowie Wlkp. sp. z o.o.PolandPublished on Jul 30, 2026
Deadline passed

Description

Energy modernization of the healthcare infrastructure in the Lubuskie Voivodeship (STAGE I), thermo modernization of the buildings of Wielospecjalistyczny Szpital Wojewódzki in Gorzów Wlkp. Sp. z o.o. The detailed description of the subject of the contract is contained in the OPZ documentation (Functional-User Program (FUP) along with annexes) and the PROJECT AGREEMENT - which are annexes to the SWZ. The subject of the contract, the contract includes: 1) art. 100 Pzp: The objective of the Contracting Authority is to improve the comfort, safety and accessibility of the healthcare infrastructure for all users of the facility, in particular patients, medical staff and people with special needs, through the implementation of investments in accordance with the principles of universal design and accessibility, as mentioned in the aforementioned. The tender also aims to limit the inconvenience of the works carried out for the users of the facility and to minimize the risk of exposure of patients and staff to asbestos fibers. Determination of the costs to achieve the indicated effect: included in the scope of the FUP preparation. The way to take into account the given social aspect within the given tender: • taking into account the requirements regarding accessibility for disabled persons and design for all users in accordance with art. 100 of the Pzp, • the application of solutions improving the comfort of patients and hospital workers, • the execution and modernization of accessibility elements, including ramps and communication for people with special needs, • the performance of works in a way that minimizes inconvenience for patients and hospital staff, • the application of solutions limiting the risk of asbestos fiber emissions and the impact of works on the health and safety of users, • ensuring the continuity of the functioning of hospital departments during the implementation of the investment, • the requirement to employ by the contractor or subcontractor persons performing construction works on the basis of an employment contract in accordance with the provisions of the Labour Code. 2) art. 96 and art. 101 para. 1 of the PZP: The objective of the Contracting Authority is to limit the impact of the investment on the environment by applying solutions that increase the energy efficiency of buildings, reduce energy and media consumption and minimize the emission of pollutants and energy losses throughout the investment life cycle. The environmental aspect has been taken into account in the FUP by specifying the requirements regarding: • the implementation of the thermo modernization of buildings, including the insulation of facades and ceilings, as well as the replacement of window and door joinery, • the application of insulating materials improving the energy parameters of building partitions, • the use of renewable energy sources, including photovoltaic installations and energy storage, • the application of an energy management system, • the use of solutions for the recovery of waste heat from medical waste incinerators and technological installations, • the modernization of the heating infrastructure in order to limit heat losses, • the application of solutions limiting the risk of asbestos fiber emissions, • the application of materials and technical solutions with increased durability and reduced operating costs. The innovative effect will be achieved through the application of modern technical, technological and installation solutions enabling the optimization of operating costs, increasing energy efficiency and the automation and monitoring of the technical infrastructure of the facilities. The innovative aspect has been taken into account in the FUP by specifying the requirements regarding: • the application of an energy management system, • the use of waste heat recovery installations, • the application of an automatic boiler cleaning system, • the use of monitoring, control and measuring systems, • the application of modern technological installations and building automation, • the application of devices and solutions limiting energy losses and operating costs, the use of solutions improving the energy efficiency of the hospital infrastructure. In the event that the description of the subject of the contract refers to standards, technical assessments, technical specifications and technical reference systems, as mentioned in art. 101 para. 1 point 2 and para. 3 of the PZP, the Contracting Authority allows equivalent solutions described, and such a reference is accompanied by the words "equivalent". The Contracting Authority imposes on the Contractors the obligation to carry out a local inspection of the site of the planned construction works. The submission of an offer must be preceded by a local inspection. The Contracting Authority sets the dates of the local inspection, which will take place on: For package no. 1: 22.06.2026 from 08:00 to 10:00 For package no. 2: 22.06.2026 from 10:00 to 12:00 For package no. 3: 22.06.2026 from 12:00 to 14:00

CPV codes

Construction workEngineering servicesEngineering design servicesArchitectural, engineering and surveying servicesBuilding installation workSite preparation workBuilding demolition and wrecking work and earthmoving workBuilding construction workSite-development workStructural worksBricklaying workBuilding completion workDrain-laying workElectrical installation workInstallation works of walkwaysInsulation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders