Czechia – Instrumentation and control equipment – 9605_Náhrada měřícího přístroje pro vyhodnocení proudové smyčky CLI 102
Description
The subject is the processing of the documentation part, the supply and subsequent implementation of the work „9605_Replacement of the measuring instrument for evaluating the current loop CLI 102“ in Dukovany Nuclear Power Station in the form of a „turnkey“ supply. Specifically, it concerns the replacement of units for evaluating the CLI 102. These units will be replaced by a panel-mounted indicating instrument installed in the local cabinet or panel for each measurement item, the contact outputs of which will replace the function of the CLI 102 unit contacts. The type of indicating instrument will be based on existing types or successors to these types (design with bargraph and numerical display), which are commonly installed on blocks at EDU. In the event that the existing cables on the stand are too short for the new terminals, it will only be necessary to install a few meters of connecting cable within one room (from the local cabinet or junction box).
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Generating sets – Dodávka elektrocentrál pro HZS ČR
Ministerstvo vnitraCzechiaGenerating setsGenerating sets with spark-ignition enginesDeadline in 32 daysPublished on Sep 20, 2026
Czechia – Lighting equipment and electric lamps – Realizace expozice TIC č.p. 6, etapa 1
Město Horní SlavkovCzechiaLighting equipment and electric lampsExhibition equipmentInstallation work of illumination and signalling systemsDeadline in 31 daysPublished on Sep 20, 2026
Czechia – Electrical materials – Rámcová dohoda na dodávky elektromateriálu v roce 2027
TECHNICKÉ SLUŽBY HRADEC KRÁLOVÉCzechiaElectrical materialsLighting equipment and electric lampsElectrical apparatus for switching or protecting electrical circuitsDeadline in 35 daysPublished on Sep 20, 2026
Czechia – Transformers – Transformátor T1 Lipnice
SUAS Distribuční s.r.o.CzechiaTransformersElectrical installation work of transformersDeadline in 30 daysPublished on Sep 20, 2026