Poland – Construction work for water and sewage pipelines – Wykonanie zagospodarowania terenu przy Zespole Szkół im. Ks. Jerzego Popiełuszki w Juchnowcu Górnym.
Description
The subject of the contract is the development of land at the Complex of Schools named after Father Jerzy Popiełuszko in Juchnowiec Górny, located on plots no. 508/24, 508/26, 508/27, 508/28 in the cadastral area of Juchnowiec Dolny, in the cadastral unit of Juchnowiec Kościelny. The development of land at the Complex of Schools named after Father Jerzy Popiełuszko in Juchnowiec Górny includes:
•Construction of an outbuilding with a waste bin canopy – construction of an outbuilding with a waste bin canopy in the northwest part of the plot. Along the planned access road to the outbuilding, 20 parking spaces have been allocated. The enlarged area, measuring 4x5m, located closest to the waste bin canopy, adjacent to the wall of the outbuilding, is designated for a container. The container area has been screened with isolation greenery.
•Extension of a canopy at the educational building - next to the educational building, near the main entrance, a canopy for children is planned. The canopy adjoins two walls (south and west) of the existing school building. Within the canopy, pedestrian traffic has been separated from vehicular traffic using concrete lawns placed along the edge of the planned walkway. Next to the planned canopy, approximately 6 bicycle stands have been placed.
•Construction of a stand for 150 – 200 seated places at the football field – outside the scope of the contract.
•Construction of three flagpoles 9m high – outside the scope of the contract.
•Supply and installation of bicycle stands – 5 units
•Supply and installation of concrete planters – 6 units
•Supply and installation of standard waste bins – 3 units
•Supply and installation of standard benches – 3 units
•Construction of a parking lot for 67 cars with the necessary accompanying infrastructure (drainage of hardened surfaces, area lighting) and demolition of the area lighting installation – along the eastern wall of the educational building, an access road with a pedestrian walkway leading to the sports field complex and facilities is planned. This area is currently paved with concrete slabs, which, due to poor technical condition, should be removed and replaced with concrete paving. The access road ends with a maneuvering area measuring 12.5x12.5m. Along the planned road, 26 parking spaces have been designed, including 2 designated for people with disabilities. The steps between the parking lots should be demolished and, after profiling the terrain (according to the road industry project), new steps should be laid. The steps will have stainless steel railings, protected against corrosion by galvanizing, with a diameter of 50mm, height 110cm. The handrails will be extended by 30cm at the beginning and end, ensuring safe use. The railing will be supported on posts with a diameter of 50mm (3 posts per handrail), anchored in the foundation. The vertical elements of the railing will have a diameter of 20mm with a maximum opening size between elements of 20cm. Next to the parking lots, near the main entrance to the Complex of Schools, approximately 28 bicycle stands will be installed. In this location, a hardened surface made of concrete paving, identical to that on the parking lots, is planned. To increase the number of parking spaces, 22 parking spaces (including 3 designated for people with disabilities) with an access road have been designed between the two existing access roads to the school. It is also planned to replace the surface on the main pedestrian walkway leading from the public road to the educational building. Along the walkway, 3 benches and a waste bin have been placed. Waste bins have also been placed next to the bicycle stands and near the designed lawns, close to the entrance to the educational building. In front of the educational building, a section of the hardened surface made of concrete paving has been added to the existing bituminous surface. This increases the maneuvering area for a bus approaching the school building. The designed approaches and accesses are connected to public roads through the existing layout of internal roads on the school grounds. Hardened surfaces are designed with water drainage to the external stormwater drainage system (according to the sanitary project). Along the designed hardening, after leveling the terrain, low escarpments will be created.
•Construction of a sanitary sewer network and demolition of the existing sanitary sewer network,
•Construction of a cable lighting network, stormwater drainage network, and demolition of the existing stormwater drainage and lighting networks – construction of a sewer network – stormwater drainage with manholes and inlets; demolition of the existing stormwater drainage network; dismantling of the existing street lighting network; dismantling of the existing lighting poles; construction of a cable lighting network 0.4 kV; installation of galvanized steel street lighting poles with LED fittings; laying of protective pipes and culverts in cable trenches; installation of a closed-circuit television system.
•Securing the inactive settler of the OGM type – due to the nature of the object, the demolition of the tank should be carried out using mechanical equipment. The area around the demolished object does not allow for convenient communication to transport debris and change the positions of the excavator. It is necessary to anticipate difficulties during demolition in the form of garages located directly above the tank and the plot fence located a short distance from the tank. These objects need to be secured to prevent damage. For this purpose, it is necessary to develop the technology and organization of the work and agree it with the Contracting Authority. Demolition or relocation of sheet metal garages; Demolition of slabs and foundations of sheet metal garages; Excavation of the tank walls to a height of 2.36 below the tank surface; Excavation of the tank walls and the flow chamber walls; After confirming the presence of waste inside the demolished tank that is not suitable for leaving in the soil, it should be extracted and disposed of.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Electrical installation work – "Budowa przyłącza kablowego elektroenergetycznego nN 0,4 kV do wieży przeciwpożarowej w leśnictwie Łężyce wraz z instalacją elektryczną - postępowanie III"
Nadleśnictwo Zielona GóraPolandElectrical installation workElectrical fitting workElectrical wiring and fitting workDeadline in 31 daysPublished on Nov 16, 2026
Poland – Construction work – Budowa oddziału psychiatrycznego dla dzieci i młodzieży oraz oddziału psychiatrycznego ogólnego dla dorosłych wraz z wyposażeniem w Wojewódzkim Zakładzie Opieki Psychiatrycznej w Sokołówce
Wojewódzki Zakład Opieki Psychiatrycznej Sp. z o.o.PolandConstruction workArchitectural and related servicesDeadline in 34 daysPublished on Nov 16, 2026
Poland – Road construction works – Zaprojektuj i wybuduj: Rozbudowa drogi wojewódzkiej Nr 652 na odcinku Filipów - Suwałki.
Podlaski Zarząd Dróg Wojewódzkich w BiałymstokuPolandRoad construction worksEngineering design servicesRoad bridge construction workDeadline in 36 daysPublished on Nov 16, 2026
Poland – Construction work – Opracowanie dokumentacji projektowej i realizacja robót budowlanych w zakresie podsystemu "Energia" - sieć trakcyjna na linii kolejowej nr 85 odc. Warszawa - Łódź
Centralny Port Komunikacyjny sp. z o.o.PolandConstruction workElectrical installations for railwaysSubstation construction workNo deadline givenPublished on Nov 16, 2026