Skip to content
Back to search

Belgium – Construction work for railways and cable transport systems – Omleidingswerken aan de N124 tussen Lillois en Baulers

Infrabel saBelgiumPublished on Nov 15, 2026
18 days left

Description

The contract concerns the works for the diversion of the L124 between Lillois and Baulers and is divided into 3 lots:

• Lot 1: Track Works

This lot includes:

o the laying of tracks south of Lillois between the BK 24 and the BK 28;

o the completion of the Baulers Gril;

o the installation of three temporary connections with the existing tracks;

o the platform and hydraulic works at Baulers;

o ...

• Lot 2: Catenary Works

This lot includes:

o the catenary equipment south of Lillois between the BK 24 and the BK 28, with the catenary portals having been installed as part of another contract;

o the implementation of the new catenary sectioning;

o ...

• Lot 3: Signalling Works

This lot includes:

o the connection of 9 new signal boxes between Braine-l’Alliance and Baulers, with the signal box bases having been completed as part of other contracts;

o the installation of point heating for the new points of the Baulers Gril;

o the installation of new signals and signalling equipment;

CPV codes

Construction work for railways and cable transport systemsCatenary's construction worksRailway signalling worksTrack construction works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders