Skip to content
Back to search
This tender has been withdrawn.

Germany – Engineering design services – Schöpfwerk Niendorf - Ersatzneubau

NLWKN Betriebsstelle LüneburgGermanyPublished on Sep 30, 2026
No deadline given

Description

The NLWKN intends to award the planning services for the replacement new construction of the Niendorf pumping station (Amt Neuhaus) with the lots 1 "Environmental Planning" and 2 "Civil Engineering Structure". Please refer to the enclosed tendering conditions with annexes and the description of services for more information. The tendering procedure will be conducted as a "negotiated procedure with prior competition" in accordance with § 17 of the Vergabeverordnung (VgV). You can now apply to participate in the negotiation procedure as part of the competition for participation via the procurement portal of the State of Lower Saxony. To do so, please complete the documents for the competition for participation uploaded under the tab "Participant Documents" and upload the required documents in the procurement portal. A list of the application documents to be submitted can be found in Annex 2 Application Form under No. 1.3. The Niendorf pumping station was built in the 1960s in the GDR and drains the catchment area of the Krainke with approximately 12,240 ha. It thus protects residential areas and agricultural land from Elbe flooding and backwater into the Sude or from independent flooding of the Sude. The right Krainkedeich connected to the pumping station was adapted to the height of the new design flood in 2014. The renovation and height adjustment of the left Krainkedeich was carried out in 2016. An adaptation to the new design water levels has not yet been carried out in the area of the pumping station, so that there are differences in height of 30 cm. Six installed propeller pumps have a total capacity of approximately 11.7 m³/s, the pumps date from the construction period of 1963 and are partly in poor condition, two pumps were renewed in 2005 and 2006. There is no screen cleaning system. In addition, the pumping station has 4 free-flow channels, which serve for regular drainage outside of flood periods, although these do not meet the requirements for permeability according to the WRRL. In 2016, a needs assessment was carried out, with the result of carrying out basic renovation. For the planning of the basic renovation, engineering services of the performance phases 1 to 3 and parts of 4 have been provided since 2021. Various components of the pumping station were examined in more detail as part of the planning: concrete, plaster, pressure pipelines, sewage canal, etc. The results of the planning showed that almost all plant components of the pumping station would have to be renovated, replaced or newly built. Due to the foreseeable extensive renovation effort, in 2025, as part of a feasibility study, it was examined whether a replacement new construction of the pumping station could represent a technically and economically better solution than a renovation of the existing structure. Based on the previous planning and the results of the 2025 feasibility study, the NLWKN intends to replace the existing pumping station with a modern new building at the location of the existing pumping station. The new pumping station is to meet the current requirements for the design water level, permeability and fish-friendly and economical operation. In addition, by increasing the pump capacity, account is to be taken of climate change. The following internal water levels are to be ensured by the pumping station: - maximum permissible internal water level: +7.80 mNHN - highest winter water level +7.70 mNHN - highest summer water level +7.40 mNHN - lowest internal water level +7.20 mNHN The design flood currently stands at 10.60 m+NHN and the corresponding construction height of the dike taking into account a freeboard of 70 cm at +11.30 mNHN. The following discharges must be discharged by the pumps of the pumping station, provided that the external water level is above the internal water level: - highest flood discharge HHQ: 11.142 m³/s - design flood discharge: 11.30 m³/s - design flood discharge taking into account the climate adaptation factor: 13.715 m³/s - summer mean water discharge SMQ: 2.076 m³/s The pumps must be designed for geodetic delivery heights between 0.00 m and 3.20 m. These boundary conditions must also be taken into account in the planning of the free flow and the associated fish pass to ensure the internal water levels and permeability. The current Niendorf pumping station is located in various nature conservation areas: - Biosphere Reserve "Niedersächsische Elbtalaue" (location of the technical structure within area A, directly adjacent to the strictly protected area C) - FFH area "Elbeniederung between Schnackenburg and Geesthacht" - EU Bird Sanctuary "Niedersächsische Mittelelbe" (location of the technical structure outside the EU Bird Sanctuary, but directly adjacent to the EU Bird Sanctuary) - Cohesion safeguard measure for the fish species bitterling and stone loach in the immediate vicinity The relevant nature conservation regulations must be taken into account in the planning.

CPV codes

Engineering design servicesEngineering servicesEnvironmental engineering consultancy servicesEnvironmental impact assessment for constructionEnvironmental issues consultancy servicesCivil engineering consultancy servicesEngineering design services for mechanical and electrical installations for buildingsEngineering design services for the construction of civil engineering worksGeotechnical engineering services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders