Germany – Engineering design services for mechanical and electrical installations for buildings – Neubau 6-gruppige Kindertagesstätte am Volksfestplatz in Germering - Fachplanung Technische Ausrüstung (ELT)
Description
Used as a gravel and waste pit in the 1940s, the Volksfestplatz hosted the eponymous Volksfest from the 1950s until 2016. The fully asphalted area was most recently used as a parking lot and for a weekly market. Since the Volksfestplatz in its current total size will no longer be needed in the future, the city of Germering has examined and decided on a de-sealing and green-space redesign of the site. To optimise the planning, the contracting authority conducted a design competition with an urban planning concept: The implementation part of the competition included the future public open spaces, designed with attractive green structures in the western part of the Volksfestplatz and with paved areas for market use in the eastern part. The concept part included the urban planning positioning and property delineation for a 6-group kindergarten in spatial context with the existing kindergarten "Kleiner Muck" on the west side of the Volksfestplatz. Based on the competition entry, the Bebauungsplan IG 12.2 was drawn up for the western area of the site, the newly planned kindergarten and the existing one. As information, the competition entry of the 1st prize winner (NMM [Nicole M. Meier] Landscape Architecture, Munich with von Angerer Architects and Urban Planners GmbH, Munich), who has already been commissioned with the planning for the implementation part, as well as the Bebauungsplan are available for inspection. _____ The subject of the contract to be awarded is the planning of a 6-group kindergarten with a gross floor area (GFA) of approx. 1,130 m². The kindergarten to be planned, like the existing one, is to be accessed via the access road "Zum kleinen Muck" and to complement the existing structure in an architecturally adequate manner. The angled, single- to two-storey building forms a traffic-free access courtyard with the existing structure. Due to soil contamination, the rooms should be designed without a basement, according to the current state of knowledge. The group rooms should be variable for both nursery and kindergarten groups. It is currently being clarified whether the catering will be provided by its own kitchen or by co-supply from the existing kitchen in the kindergarten "Kleiner Muck". All the outdoor spaces required for the kindergarten should be designed at ground level. When implementing the planning of the new kindergarten, the spatial proximity of the construction site to the existing kindergarten, which will remain in operation, and to the section-by-section conversion of the Volksfestplatz into green and market areas must be taken into account. The recommendations of the specialist planning office for contaminated sites and soil, Nickol + Partner GmbH, must be observed during the planning. _____ The contracting authority places particular emphasis on the cost-effectiveness of the project. The aim is a cost-optimised construction method with rational and economical floor plans according to the principles of simple construction (e.g. building type E). The buildings should promise economically justifiable production costs through construction and material selection and ensure low maintenance in the long term, particularly through the use of durable and low-maintenance materials, robust building services and low energy consumption. In addition, particular attention should be paid to the planning of a sustainable building: Future-oriented design concepts are expected, which, with the lowest possible use of energy and resources, achieve the highest possible overall cost-effectiveness, comfort and architectural quality. The aim is a construction method that handles raw materials and energy sparingly and reduces environmental impact to the lowest possible level. The day-care centre is to be built in timber construction, also with the aim of shortening construction times. Energetically, the contracting authority aims for an overall concept of architecture and energy efficiency, which first checks the exploitation of passive measures (LowTech principles) before the use of active measures. In general, the use of local, renewable energies is sought. A photovoltaic system is to be installed on the flat roofs.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Engineering services – Sanierung der Sporthalle der staatlichen Grundschule "Am Rehberg", Wutha-Farnroda - Fachplanung Technische Ausrüstung HLS
Landratsamt WartburgkreisGermanyEngineering servicesHeating-system design servicesPlumbing consultancy servicesNo deadline givenPublished on Oct 22, 2026
Germany – Engineering services – Schadstoffuntersuchungen (Rahmenvereinbarung/Jahresabrufauftrag) - Verschiedene Objekte in 5 Stadtbezirken, 45875 Gelsenkirchen
Stadt GelsenkirchenGermanyEngineering servicesEnvironmental servicesPollutants tracking and monitoring and rehabilitation servicesDeadline in 30 daysPublished on Oct 22, 2026
Germany – Engineering design services for mechanical and electrical installations for buildings – Konzepterstellung Modernisierung der Energieversorgung
Deutsche Rentenversicherung Westfalen - Baureferat -GermanyEngineering design services for mechanical and electrical installations for buildingsNo deadline givenPublished on Oct 22, 2026
Germany – Civil engineering consultancy services – 70-00251-2260-R Sachverständigenleistung RLT - PR1320626-2260-B
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. - Einkauf B12 - Vergabestelle BauGermanyCivil engineering consultancy servicesDeadline in 31 daysPublished on Oct 22, 2026