Skip to content
Back to search

Germany – Load-bearing structure design services – Fritz-Haber-Institut der Max-Planck-Gesellschaft, Berlin Umbau und Erweiterung Gebäude T: Tragwerksplanung

Max-Planck-Gesellschaft , GV-BauabteilungGermanyPublished on Aug 13, 2026
No deadline given

Description

The Fritz-Haber-Institut (FHI) was founded in 1911 as the Kaiser-Wilhelm-Institut für Physikalische Chemie und Elektrochemie in Berlin-Dahlem and was incorporated into the MPG in 1953. The focus of the research activities is the fundamental understanding of elementary processes in physical chemistry and thus the relationship between structure, reactivity and dynamics at surfaces, interfaces, nanostructures, molecules and clusters. Currently, there is a significant shortage of highly equipped, wet-chemical laboratory space with a design suitable for automated operation. To meet the demand, building T is to be converted and expanded into a laboratory building. The office cubes arranged on the north side of the hexagonal building and the central hall are to be partially demolished and the technical equipment completely dismantled. The resulting spaces between the two partially demolished cubes are to be used to insert the extension into the existing building. In this new part of the building, all high-equipped rooms, such as laboratories and hazardous material stores, as well as most of the central technology and technical services, are to be housed on three floors, one of which is a basement. The "core" of the new area is the AI-controlled automated laboratory, which is to be created on the ground floor. On the floor above, wet chemistry laboratories with evaluation workstations are to be created, which can be subdivided into several laboratory rooms. The future building T is to have a NUF of approx. 1,400 m² (approx. 3,370 m² BGF), with the planned usable areas distributed as follows: 80m² chemical store, approx. 440 m² each robot-operated AI-supported chemistry large-area laboratory, approx. 440 m² wet chemistry laboratories, approx. 340 m² office space, approx. 100 m² storage space. For the NUF 7, a space requirement of approx. 100 m² has been determined, and for the technical areas approx. 500 m². The estimated total construction costs (KG 200 to 700) for the conversion and extension amount to approx. 22,800,000 € net. During the planning phase, cost estimates are to be prepared separately for the costs of the extension and the conversion/renovation of the existing building and combined in an overall summary. Further details can be found in the measures and performance description in Annex 07 and the drawings in Annex 08. Additional project details will be provided in the second stage of the procedure. The project book will be sent to the selected bidders with the invitation to submit an offer. The subject of this VgV tendering procedure are the required services of the "structural design" according to § 51 in conjunction with Annex 14 of the HOAI 2021 in the LPH 1 to 6, plus special services. A detailed description of the services is given in Annex 04. Special note regarding bidder questions due to special external events (e.g. Sars-COV-2 or Ukraine war): Please take into account any possible or recognisable impairments in your offer, e.g. with regard to the availability of materials and products, labour, a possible delay in the submission of required evidence, effects on any subcontractors, etc. Questions arising in this context, please submit in good time before the deadline for submission of offers via the eVergabe messaging system.

CPV codes

Load-bearing structure design services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders